My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 3:12:05 AM
Creation date
3/11/2020 11:00:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br /> f Chronology 3 <br /> page ' <br /> 2701 W. March Lane, Stockton <br /> 05/10/99 Date on-site air sparge/soil vapor extraction feasibility test <br /> conducted. Details in ERI consulting's Air Sparge/Soil Vapor <br /> Extraction Test Report, dated October 18, 1999. <br /> 2/28/99 Date of Corrective Action Plan (CAP) submitted to EHD for periodic <br /> groundwater extraction and transport off-site. .EHD approves as i <br /> interim remediation action plan (TRAP) in letter dated February 2, <br /> 2000. If <br /> i <br /> 06 to 10/00 "UST-MW" installed•in UST pit and periodic groundwater extraction <br /> from this well and MW-3 begins as TRAP. Details in ERI <br /> consulting's second Corrective Action Plan, September 25, 2001. <br /> 11/23/00 Site now assigned to Dot Lofstrom, LOP Unit IV. <br /> 03/02/01 EHD files legal case #CV009241 with San Joaquin County court for_ j <br /> UST Regulation violations. `I <br /> 09/25/01 Date of ERI consulting's Corrective Action Plan which proposes <br /> ozone sparge/injection and includes results of periodic groundwater <br /> I <br /> extraction on-site June to October 2000. EHD approves. in <br /> correspondence dated October 2, 2001. <br /> 10/02/01 Date of ozone injection/CAP conditional approval EHD letter. <br /> 11/01/01 Site now assigned to Margaret Lagorio, LOP-Unit IV supervisor. f <br /> 01/21/02 Date ten air 'sparge wells installed on-site. Details in ERI <br /> consulting's Air Sparge Well and System Installation Report, dated <br /> April 22, 2002. <br /> 08/15/02 Ozone sparge system goes online. <br /> 05/06/08 Date the EHD comment letter to Stantec consulting's Work Plan for <br /> Additional Off-Site Assessment, and Hydrogen Peroxide Bench <br /> Scale Testing, dated March 20, 2008. MW-11 D/I/S proposed off- <br /> site. Problems with off-site private property owner access holds up <br /> installation of well. <br /> 12/003/08 Date of EHD letter commenting on bench scale testing. <br /> 01/27/09 Date the EHD received Stantec consulting's Work Plan for Batch <br /> Extraction, dated December 10, 2008, on Geotracker. <br />
The URL can be used to link to this page
Your browser does not support the video tag.