Laserfiche WebLink
U <br /> f Chronology 3 <br /> page ' <br /> 2701 W. March Lane, Stockton <br /> 05/10/99 Date on-site air sparge/soil vapor extraction feasibility test <br /> conducted. Details in ERI consulting's Air Sparge/Soil Vapor <br /> Extraction Test Report, dated October 18, 1999. <br /> 2/28/99 Date of Corrective Action Plan (CAP) submitted to EHD for periodic <br /> groundwater extraction and transport off-site. .EHD approves as i <br /> interim remediation action plan (TRAP) in letter dated February 2, <br /> 2000. If <br /> i <br /> 06 to 10/00 "UST-MW" installed•in UST pit and periodic groundwater extraction <br /> from this well and MW-3 begins as TRAP. Details in ERI <br /> consulting's second Corrective Action Plan, September 25, 2001. <br /> 11/23/00 Site now assigned to Dot Lofstrom, LOP Unit IV. <br /> 03/02/01 EHD files legal case #CV009241 with San Joaquin County court for_ j <br /> UST Regulation violations. `I <br /> 09/25/01 Date of ERI consulting's Corrective Action Plan which proposes <br /> ozone sparge/injection and includes results of periodic groundwater <br /> I <br /> extraction on-site June to October 2000. EHD approves. in <br /> correspondence dated October 2, 2001. <br /> 10/02/01 Date of ozone injection/CAP conditional approval EHD letter. <br /> 11/01/01 Site now assigned to Margaret Lagorio, LOP-Unit IV supervisor. f <br /> 01/21/02 Date ten air 'sparge wells installed on-site. Details in ERI <br /> consulting's Air Sparge Well and System Installation Report, dated <br /> April 22, 2002. <br /> 08/15/02 Ozone sparge system goes online. <br /> 05/06/08 Date the EHD comment letter to Stantec consulting's Work Plan for <br /> Additional Off-Site Assessment, and Hydrogen Peroxide Bench <br /> Scale Testing, dated March 20, 2008. MW-11 D/I/S proposed off- <br /> site. Problems with off-site private property owner access holds up <br /> installation of well. <br /> 12/003/08 Date of EHD letter commenting on bench scale testing. <br /> 01/27/09 Date the EHD received Stantec consulting's Work Plan for Batch <br /> Extraction, dated December 10, 2008, on Geotracker. <br />