My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
2701
>
3500 - Local Oversight Program
>
PR0545517
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2020 3:12:05 AM
Creation date
3/11/2020 11:00:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0545517
PE
3528
FACILITY_ID
FA0003798
FACILITY_NAME
MARCH LANE 76*
STREET_NUMBER
2701
Direction
W
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95219
APN
11619007
CURRENT_STATUS
02
SITE_LOCATION
2701 W MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chronology L v page 2 <br /> 2701 W. March Lane, Stockton <br /> 08/25/95 Date CAP addendum dated August 23, 1995, submitted to the <br /> EHD. <br /> 08/30/95 Date of Notice of Reimbursement (NOR) sent to RP. Site enters <br /> EHD-Unit IV, Local Oversight Program (LOP) as a soil site and is <br /> assigned to Ron Rowe. <br /> 09/18/95 Date public participation ends successfully and the EHD approves <br /> the CAP addendum for soil sampling, excavation and removal, and <br /> soil boring installations on-site. <br /> 09/22/95 Twenty one Geoprobes, "GP-1" to "GP-21", installed on-site. <br /> 09/27/95 Site status changes to groundwater site, "35.26" based on push- <br /> point water samples collected from GP borings and contamination <br /> note in preliminary laboratory update to Delta consulting. <br /> 10/23/95 Date of Prop 65 (#95-137) filed by EHD-Unit III staff for diesel UST <br /> punctured during three UST removals. Unknown volume of rinsate <br /> liquid was released in the UST pit to the subsurface. <br /> 02/06/96 Date of Delta consulting's report, Environmental Investigation <br /> Report detailing procedures and results of UST removals and 21 <br /> Geoprobe installations. <br /> 09/04/96 Date monitoring wells MWA through MW-3 installed on-site. <br /> Report of findings, Additional Hydrogeologic Assessment Results, <br /> Delta, dated December 5, 1996. <br /> 04/15/97 Monitoring wells MW-4S/D through MW-7S/D and hand augers HA- <br /> 1 through HA-3 installed. Details in ERI consulting's report of <br /> findings, Supplemental Evaluation and Investigation Report, dated <br /> June 3, 1997. <br /> 02/18/99 Soil borings B-8 through B-10 and CPT-1 through CPT-3 installed <br /> on-site. Details in ERI consulting's Supplemental Evaluation of Soil <br /> and Groundwater Report, dated March 2, 1999. <br /> 03/16/99 SWRCB-CUF accepts site into fund: Claim#013532, Priority D. <br /> 04/08/99 Monitoring wells MW-8S/D through MW-10S/D installed off-site. <br /> Details in ERI consulting's Supplemental Evaluation of <br /> Groundwater Report, June 9, 1999. <br />
The URL can be used to link to this page
Your browser does not support the video tag.