Laserfiche WebLink
A _ <br /> F�F�tt <br /> Abe Ayesh and Sami Ayesh <br /> November 26, 1990 <br /> Page 2 <br /> 6. Indicate method. to be used to analyze for total lead. <br /> 7. Provide an estimate of cubic yardage of soil to be <br /> removed during re-excavation attempt. Illustrate <br /> dimensions of original tank pit and proposed excavation. <br /> 8. Submit a history of the site which 'includes the <br /> disposition of the contaminated soil and whether the pit <br /> is open or closed. <br /> 9. Submit a Site Safety Plan. <br /> 10. A revised re-excavation work plan should be submitted by <br /> December 5, 1990. <br /> If you have further questions, contact Darlene Reuss, RENS, at <br /> (209) 468-3441. <br /> Jogi Khann M.D. , M.P.H. <br /> /Healthicer oKCotulla, REHS, Program Manager <br /> tal Health Division <br /> Enc. <br /> c: CVRWQCB - G. L. Boggs <br /> c: Pat Riddle, Attorney at Law <br /> c: Uria, Inc. - John Rapp <br /> c: Mr. and Mrs. Richard Spohn <br />