My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
R A BRIDGEFORD
>
7850
>
2200 - Hazardous Waste Program
>
PR0521781
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2024 2:28:14 PM
Creation date
3/12/2020 1:56:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0521781
PE
2229
FACILITY_ID
FA0014789
FACILITY_NAME
SJC PERMANENT HOUSEHOLD HAZ WASTE
STREET_NUMBER
7850
Direction
S
STREET_NAME
R A BRIDGEFORD
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
01
SITE_LOCATION
7850 S R A BRIDGEFORD ST
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
907
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSOLIDATED CONTINGENCY/EMERGENCY ACTION PLAN <br /> San Joaquin County <br /> Permanent Household Hazardous Waste Collection Facility <br /> September 1,2011 <br /> This Contingency Plan will be implemented under any of the following circumstances: <br /> Fire and/or Explosion: <br /> • Fire could cause release of toxic finnes. <br /> • Fire could spread and possibly ignite materials stored on-site,or cause heat-induced explosions. <br /> • Fire could possibly spread to off-site areas. <br /> • Imminent danger exists that an explosion could occur,creating a safety hazard. <br /> • Imminent danger exists that an explosion could ignite other hazardous wastes on-site. <br /> • Imminent danger exists that an explosion could result in release of a toxic material. <br /> • Explosion has occurred. <br /> Spills or Material Release: <br /> • Spill could result in release of flammable liquids or flammable vapors,thus causing a fire or <br /> explosion hazard. <br /> • Spill could result in release of corrosive and/or reactive materials. <br /> • Spill could cause release of toxic vapors or fumes. <br /> • Spill cannot be contained on-site resulting in contamination of off-site pavement and/or soil <br /> and/or groundwater. <br /> A. PRE-EMERGENCY PLANNING <br /> 1. Chemical Shill <br /> i. In the event of a spill,release and/or discharge of hazardous materials, the on site <br /> staff will follow the Emergency Response Procedures as outlined in Section B of <br /> this Emergency Action Plan (EAP). <br /> ii. The Primary Emergency Coordinator(Project Manager)will be contacted, <br /> employees will evacuate the building and take with them any persons at the <br /> facility. Evacuation routes are posted in the facility and are included as <br /> Attachment A to this plan. <br /> 2. Chemical Exposure <br /> i. In the event that an employee, subcontractor, or any other person is accidentally <br /> exposed to a hazardous substance while on San Joaquin County property,and that <br /> person is not unconscious or experiencing severe respiratory problems, the person <br /> (with their permission) will undergo immediate decontamination before being <br /> transported(with their permission) to a medical facility(see Section G,below). <br /> Decontamination will include rinsing or cleaning the affected area with soap and <br /> water or sanitary wipes (if in the eyes rinse with eyewash for a minimum fifteen- <br /> minute period), and removal of any contaminated clothing. Locations of all <br /> - I - <br />
The URL can be used to link to this page
Your browser does not support the video tag.