Laserfiche WebLink
0. Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan <br /> �-- Company Tracy Plant <br /> Appendix I Record of Containment Dike Drainage <br /> Record of Containment Dike Drainage <br /> This record, or the Periodic Inspection Form (Appendix G) is to be used when rainwater captured <br /> within a diked area is pumped from containment to the storm water drainage system. Rainwater <br /> being removed from containment is to be inspected for the presence of oil as evidenced by a <br /> sheen, film, or discoloration PRIOR to being released. The site manaqer is to verify only <br /> sheen free water remains within containment by si_gnin_g one of these forms. Once verified, <br /> contained water can be released. <br /> Date�� Secondary Oil Sheen Rain Water Signature <br /> Containmeni '7Detected? Discharged? <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> ❑ Yes ❑ No ❑ Yes ❑ No <br /> Seconclary Containment Codes: <br /> 1 10,000 Gal. Diesel <br /> 2 300 Gal. Gasoline AST <br /> 3 500 Gal.Automatic Transmission Fluid <br /> 4 500 Gal. Lube (Motor)Oil <br /> 5 500 Gal. Hydraulic Oil <br /> 6 80 Gal. Emergency Generator Belly Tank <br /> 2CT <br />