Laserfiche WebLink
Northwest Pipe Spill Prevention, Control, and Countermeasure (SPCC) Plan 111 <br /> Company Tracy Plant <br /> Table 5.2 Oil Storage, Testing, Secondary Containment, and Potential Discharge Information <br /> Oil Storage Type of Shell Overfill Testing Testing Type of Potential Direction of Secondary Secondary <br /> Container a,b, Oil Capacity Protection Method Frequencyf failure discharge flow for containment containment <br /> C (gallons) Method a (discharge volume uncontained method 9 capacity h,i <br /> scenario) (gallons) discharge (gallons) <br /> Diesel fuel Diesel 10,000 Overfill P, E,L P, E(5), L(10) Release 10000 SE generally Diked 11,500 <br /> storage tank prevention from fuel towards middle containment area <br /> AST Category 2 valve dispensing road (41'x 15'x 02.5') <br /> (ii) hose <br /> Gasoline fuel Gasoline 300 Measuring P Monthly visual Release 300 SE generally Diked 330 <br /> storage tank (unleaded) stick and order inspection/Annual from fuel towards middle containment area <br /> AST Category 2 volume visual inspection for dispensing road (41'x 15'x 025) <br /> management signs of deterioration hose <br /> iv and discharges <br /> Transmission Transmission 500 Measuring P Monthly visual Hose 500 E generally Diked 1,800 <br /> fluid storage tank fluid stick and order inspection/Annual connection towards drain to containment area <br /> AST Category 2 volume visual inspection for failure catch basin. (37'x 13'x 0.5') <br /> management signs of deterioration <br /> iv and discharges <br /> Motor oil storage Motor oil 500 Measuring P Monthly visual Hose 500 E generally Diked 1,800 <br /> tank stick and order inspection/Annual connection towards drain to containment area <br /> AST Category 2 volume visual inspection for failure catch basin. (37'x 13'x 0.5') <br /> management signs of deterioration <br /> iv and discharges <br /> Hydraulic fluid Hydraulic oil 500 Measuring P Monthly visual Hose 500 E generally Diked 1,800 <br /> storage tank stick and order inspection/Annual connection towards drain to containment area <br /> AST Category 2 volume visual inspection for failure catch basin. (37'x 13'x 05) <br /> management signs of deterioration <br /> iv and discharges <br /> Mobile refueler Diesel/Gasoline 1,500 A person is P Monthly visual Failure of 250 Direction of flow Spill kit materials 265 <br /> Diesel tank(1500 &700 present to inspection/Annual tank shell would depend on that can absorb <br /> Gal)&Gas tank monitor unit visual inspection for due to the location of the 265 gallons of oil. <br /> (700 Gal.) filling and signs of deterioration vehicle truck at the time <br /> Category 1 refueling to and discharges impact; of the discharge; <br /> units onsite iv NE generally <br /> Emergency Diesel 80 Order volume P Monthly visual Failure of 80 E generally Custom fabricated 248 <br /> Generator management inspection/Annual tank shell towards drain to (metal surround <br /> (iii) visual inspection for due to catch basin. epoxied or otherwise <br /> signs of deterioration vehicle attached and sealed <br /> to concrete slab <br /> and discharges impact <br /> under EG skid <br /> containment <br /> 10'x 4'x 0.83' <br />