Laserfiche WebLink
Page 2 of 2 <br /> AGE needs to complete the well space with cement,within well bore to secure the casing and allow for the well <br /> development without possible damaging the wells casing. <br /> Nuel,please call me with any questions while Lori is not working this week. AGE has proposed to fill the well <br /> bore and develop the well on Thursday. <br /> William R. Little <br /> California Professional Geologist 7473 <br /> Oregon Registered Geologist 62254 <br /> Washington Licensed Geologist 2778 <br /> Advanced GeoEnvi ronmental Inc. <br /> Stockton-Santa Rosa•Montereynrea-Spokane•Reno <br /> (800)511-9300 <br /> From: Lori Duncan [EH] [mailto:lduncan@sjcehd.com] <br /> Sent: Friday, August 06, 2010 4:06 PM <br /> To: wlittle@advgeoenv.com <br /> Subject: 135 Miner <br /> Bill, <br /> Has the development of the new wells at Cancun Rest. site been scheduled? Please let me know when it is. <br /> There is a problem with the grouting of well MW-1 B; the initial pour dropped beyond any visable level. After <br /> completing well MWAA they added at least 1.5 more barrels of grout to MWA B and it wass continuing to fall <br /> slowly when I left the site. I told Rebecca and the drillers not to add anymore, as Rebecca said there is a storm <br /> drain line in very close proximity. I think the missing grout needs to be found before any more barrels are <br /> inadvertently poured down the storm drain. This needs to be checked soon. <br /> Lori Duncan, Senior REHS <br /> San Joaquin County <br /> Environmental Health Department <br /> Id u nca_n_@sice_h_d.com <br /> (209)468-0337 phone <br /> (209)468-3433 fax <br /> 8/17/2010 <br />