My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005328
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MILGEO
>
850
>
3500 - Local Oversight Program
>
PR0545550
>
ARCHIVED REPORTS_XR0005328
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2020 7:16:43 PM
Creation date
3/16/2020 4:52:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005328
RECORD_ID
PR0545550
PE
3528
FACILITY_ID
FA0003973
FACILITY_NAME
SHOCKEY & SONS TRUCKING
STREET_NUMBER
850
STREET_NAME
MILGEO
STREET_TYPE
RD
City
RIPON
Zip
95366
CURRENT_STATUS
02
SITE_LOCATION
850 MILGEO RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 07 June 2002 <br /> AGE-NC Project No. 95-0185 <br /> Page 5 of 6 <br /> After installing the well casing in each boring, a filter pack material will be slowly emplaced through <br /> the augers over the screen interval to approximately two feet above the screened intervals for the <br /> monitoring well. The filter pack material in the ground water monitoring wells will consist of pre- <br /> washed#3 Lonestar sand. Following placement ofthe filter pack,the screened interval from each well <br /> will be surged for approximately 20 minutes utilizing a surge block to assist in settling the filter pack. <br /> Additional filter pack material will be added if settling occurs. <br /> A nominal 2-foot bentonite seal(bentonite chips)will be placed above the filter pack to minimize the <br /> potential for grout penetration into the screened section of the well. The bentonite seal will be formed <br /> by pouring bentonite chips into the annulus and allowing the pellets to settle on the filter pack. The <br /> bentonite pellets will be allowed to hydrate with tap water for a minimum of one-half hour prior to <br /> grouting. <br /> The filter pack material in the sparge points will consist of a #2/16 sand. After installing the lower <br /> sparge point casing in boring,the filter pack material will be slowly emplaced through the augers or <br /> tremie pipe over the screen interval to the top of the sparge point. A bentonite seal will be formed by <br /> pouring bentonite pellets into the annulus, to a depth of 25 feet bsg. The upper sparge point casing <br /> • will be placed into the boring, and a second filter pack material will be slowly emplaced to the top of <br /> the upper sparge point. An upper bentonite seal will be formed by pouring bentonite chips into the <br /> annulus and allowed to hydrate with tap water for a minimum of one-half hour prior to grouting. <br /> The remaining annular space will be filled to the ground surface with a cement grout. The grout <br /> mixture will consist of Type F11 portland neat cement and not more than 6 gallons of water per <br /> 94-pound sack of cement. The grout will be placed by pumping through tremmie pipe. A grouting <br /> inspection will be scheduled with EHD personnel. <br /> 4.3. WELL DEVELOPMENT <br /> Development of the proposed wells will consist of a combination of bailing with a two-inch diameter <br /> stainless steel and/or PVC bailers to remove the major portion of fine-grained sediment from inside <br /> the well, surging to flush out or draw in sediment from the filter pack and additional ground water <br /> evacuation (purging) with a submersible pump to finish the removal of fine-grained sediment. <br /> Developmental purging activities will be continued until field.parameter(pH, electrical conductivity, <br /> and temperature) readings have stabilized and purged water is visually sediment-free. . Well <br /> develoinent r�vill—occur no sooriexjhan 24=hours following well completion:— - <br /> Advanced GeoEnvironmentai,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.