Laserfiche WebLink
. 07 June 2002 <br /> AGE-NC Project No. 95.0185 <br /> Page 4 of b <br /> 4.1. DRILLING AND SAMPLING <br /> A soil boring for installation of a ground water well will be advanced to a depth of 30 feet bsg <br /> utilizing a truck-mounted, hollow-stem drill rig and 8-inch diameter hollow-stem augers; three soil <br /> borings for installation of ozone sparge wells will be advanced to a depth of 40 feet bsg utilizing <br /> 8-inch diameter hollow--stein augers. Soil cuttings and rinseate generated during drilling activities will <br /> be containerized in properly labeled DOT-approved 55-gallon drums, and stored on-site in an area <br /> lacking public access. Disposal alternatives for rinseate and stockpiled soil will be selected based on <br /> results of a laboratory analysis. <br /> Soil samples will be collected at five-foot intervals for logging purposes, beginning at a depth of <br /> 5 feet bsg; at least one soil sample per every 15 linear feet will be analyzed by a State of California <br /> Department of Health Services (DHS)-certified laboratory for the following constituents: <br /> • Total petroleum hydrocarbons as gasoline and diesel(TPH•-g and TPH-d)in accordance with <br /> EPA Method 8015 Modified; <br /> • Benzene,toluene,ethylbenzene and total xylene(BTEX compounds)and methyl tertiary butyl <br /> ether (MTBE) in accordance with EPA Method 8020; <br /> Fuel oxygenated compounds including MTBE, tertiary-amyl methyl ether (TAME), di- <br /> isopropyl ether(DIPS),ethyl tertiary-butyl ether(ETBE)and tertiary butanol(TBA)by EPA <br /> method 8260 Modified. <br /> Laboratory reports for soil analysis, testing methods, laboratory quality assurance/quality control <br /> (QA/QC) reports, and sample chain of custody documentation will be presented in a report with <br /> findings and recommendations. ' <br /> 4.2. WELL COMPLETION <br /> The ground water monitoring well will be completed utilizing a single 2-inch diameter schedule 40 <br /> f polyvinylchloride (PVC) well casing with 15 feet of 0.020-inch slotted well screen; proposed <br /> monitoring well construction diagram is depicted in Figure 4. <br /> soil boring=will.be advanced for_the.installation_of,six,sparge_points.._.Following advancement <br /> of the soil boring, two manufacturer-assembled 2-inch by 30-inch microporous sparge points and <br /> casings will be installed in each boring; the sparge points will be installed at depths of approximately <br /> 25 feet bsg and 40 feet bsg. A3/4-inch PVC riser will connect the sparge points to a surface ozone <br /> generator. A proposed ozone sparge well construction diagram is depicted in Figure 5: <br /> Advanced GeoEnvironmenW,Inc. <br />