My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
3601
>
1900 - Hazardous Materials Program
>
PR0519676
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2020 11:37:03 AM
Creation date
3/17/2020 10:24:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0519676
PE
1921
FACILITY_ID
FA0009487
FACILITY_NAME
UNIVERSITY OF THE PACIFIC
STREET_NUMBER
3601
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95211
APN
11314010
CURRENT_STATUS
01
SITE_LOCATION
3601 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
180
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
University of the Pacific Spill Prevention, Control, and Countermeasure (SPCC) Plan <br />Stockton, California Aboveground Fuel Storage Tanks <br />TABLE OF CONTENTS <br />Page <br />Introduction 1 <br />Part 1: Plan Administration <br />1.1 Management Approval and Designated Person 3 <br />1.2 Professional Engineer Certification 3 <br />1.3 Location of SPCC Plan 4 <br />1.4 Plan Review 4 <br />1.5 Facilities, Procedures, Methods, or Equipment Not Yet Fully Operational 5 <br />1.6 Cross-Reference with SPCC Provisions 5 <br />Part 2: General Facility Information <br />2.1 Facility Description 8 <br />2.2 Evaluation of Discharge Potential 11 <br />Part 3: Discharge Prevention — General SPCC Provisions <br />3.1 Compliance with Applicable Requirements 12 <br />3.2 Facility Layout Diagram 12 <br />3.3 Spill Reporting 12 <br />3.4 Potential Discharge Volumes and Direction of Flow 13 <br />3.5 Containment and Diversionary Structures 14 <br />3.6 Practicability of Secondary Containment 16 <br />3.7 Inspections, Tests, and Records 16 <br />3.8 Personnel, Training, and Discharge Prevention Procedures 18 <br />3.9 Security 19 <br />3.10 Tank Truck Unloading Requirements 19 <br />3.11 Brittle Fracture Evaluation 22 <br />3.12 Conformance with State and Local Applicable Requirements 22 <br />Part 4: Discharge Prevention — SPCC Provisions for Onshore Facilities <br />(Excluding Production Facilities) <br />4.1 Facility Drainage 23 <br />4.2 Bulk Storage Containers 23 <br />4.3 Transfer Operations, Pumping, and In-Plant Processes 29 <br />Version 1.0, 11 /28/2016
The URL can be used to link to this page
Your browser does not support the video tag.