Laserfiche WebLink
University of the Pacific <br />Stockton, California <br />Spill Prevention, Control, and Countermeasure (SPCC) Plan <br />Aboveground Fuel Storage Tanks <br />Part 5: Discharge Response <br />5.1 Response to a Minor Discharge 30 <br />5.2 Response to a Major Discharge 31 <br />5.3 Waste Disposal 32 <br />5.4 Discharge Notification 32 <br />5.5 Cleanup Contractors and Equipment Suppliers 33 <br />List of Tables <br />Table 1-1: Plan Review Log 6 <br />Table 1-2: SPCC Cross-Reference 7 <br />Table 2-1: Petroleum Containers 9 <br />Table 2-2: Petroleum Discharge History 10 <br />Table 3-1: Potential Discharge Volume and Direction of Flow 13 <br />Table 3-2: Inspection and Testing Program 16 <br />Table 3-3: Fuel Transfer Procedures 21 <br />Table 4-1: List of Petroleum Containers 24 <br />Table 4-2: Scope and Frequency of Bulk Storage Containers Inspections and Tests 27 <br />Appendices <br />Site Plan and Facility Diagrams <br />Substantial Harm Determination <br />Facility Inspection Checklists <br />Record of Discharge Prevention Briefings and Training <br />Calculation of Secondary Containment Capacity <br />Records of Tank Integrity and Pressure Tests <br />Emergency Contacts <br />Discharge Notification Form <br />Discharge Response Equipment Inventory <br />Agency Notification Standard Report <br />Convault Tank Specifications <br />Version 1.0, 11/2X/20 lb