Laserfiche WebLink
University of the Pacific Spill Prevention, Control, and Countermeasure (SPCC) Plan <br />Stockton, California Aboveground Fuel Storage Tanks <br />Provision Plan Section Page <br />112.7(a)(5) Part 5: Discharge Response 32 <br />112.7(b) 3.4 Potential Discharge Volumes and Direction of Flow 13 <br />112.7(c) 3.5 Containment and Diversionary Structures 14 <br />112.7(d) 3.6 Practicability of Secondary Containment 16 <br />112.7(e) 3.7 Inspections, Tests, and Records 16 <br />Appendix B <br />112.7(f) 3.8 Personnel, Training and Discharge Prevention Procedures 18 <br />112.7(g) 3.9 Security 19 <br />112.7(h) 3.10 Tank Truck Unloading 19 <br />112.7(i) 3.11 Brittle Fracture Evaluation 22 <br />112.7(j) 3.12 Conformance with Applicable State and Local Requirements 22 <br />112.8(b) 4.1 Facility Drainage 23 <br />112.8(c)(1) 4.2.1 Construction 23 <br />112.8(c)(2) 4.2.2 Secondary Containment 25 <br />112.8(c)(3) 4.2.3 Drainage of Diked Areas 26 <br />Appendix D <br />112.8(c)(4) 4.2.4 Corrosion Protection 26 <br />112.8(c)(5) 4.2.5 Partially Buried and Bunkered Storage Tanks 26 <br />112.8(c)(6) 4.2.6 Inspection 26 <br />Appendix C <br />Appendix B - Facility Inspection Checklists <br />112.8(c)(7) 4.2.7 Heating Coils 27 <br />112.8(c)(8) 4.2.8 Overfill Prevention System 27 <br />112.8(c)(9) 4.2.9 Effluent Treatment Facilities 28 <br />112.8(c)(10) 4.2.10 Visible Discharges 28 <br />112.8(c)(11) 4.2.11 Mobile and Portable Containers 28 <br />112.8(d) 4.3 Transfer Operations, Pumping and In-Plant Processes 29 <br />112.20(e) Certification of Substantial Harm Determination Appendix B <br />* Only selected excerpts of relevant rule text are provided. For a complete list of SPCC requirements, <br />refer to the full text of 40 CFR Part 112. <br />-8- <br />Version 1.0, 11/28/2016