Laserfiche WebLink
University of the Pacific Spill Prevention, Control, and Countermeasure (SPCC) Plan <br />Stockton, California Aboveground Fuel Storage Tank <br />Perimeter Berm: A 3-inch asphalt berm is present along the southern <br />perimeter of the Site approximately 40 feet from the AST. The perimeter <br />berm is approximately 120 feet in length and is intended to prevent the flow <br />of fuel spills to the area located outside the southern fence of the Site. <br /> <br />3.6 Practicability of Secondary Containment (40 CFR 112.7(d)) <br />The University management has determined that AST's secondary containment is practicable at <br />this facility. <br /> <br />3.7 Inspections, Tests, and Records (40 CFR 112.7(e)) <br />As required by the SPCC rule, the University performs the inspections, tests, and evaluations <br />listed in the following table. Table 3-2 summarizes the various types of inspections and tests <br />performed at the facility. The inspections and tests are described later in this section, and in the <br />respective sections that describe different parts of the facility (e.g., Section 4.2.6 for bulk <br />storage containers). <br />-17- <br />Version 1.0, 11/28/2016