My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012256
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
545
>
3500 - Local Oversight Program
>
PR0545551
>
ARCHIVED REPORTS_XR0012256
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 10:07:33 PM
Creation date
3/17/2020 1:51:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012256
RECORD_ID
PR0545551
PE
3528
FACILITY_ID
FA0012578
FACILITY_NAME
CHETS AUTO
STREET_NUMBER
545
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95220
CURRENT_STATUS
02
SITE_LOCATION
545 E MINER AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' Quarterly Report - Third Quarter 2002 <br /> CHET'S AUTOMOTIVE <br /> 1 91 545 East Miner Avenue, Stockton, California <br /> ' 1.4. INTRODUCTION <br /> At the request of the Estate of Chester Farris (property owner),Advanced GeoEnvironmental, Inc <br /> ' (AGE)has prepared the enclosed quarterly report for 545 East Miner Avenue, Stockton, California <br /> (the site) The scope of work Included monitoring and sampling five groundwater monitoring wells <br /> and preparation of this report The site and its surroundings are Illustrated on Figure 1 Structures, <br /> ' probe boring, soil sample and monitoring well locations are shown on Figure 2 <br /> This report was prepared in accordance with Central Valley Regional Water Quality Control Board <br /> ' (CVRWQCB)guidelines for investigations ofUST sites Site history and findings from previous site <br /> investigations are summarized in Appendix A,the results ofprevious monitoring events are included <br /> ' in the tables of this report <br /> ' 2.0. PROCEDURES <br /> The investigation was conducted in accordance with guidelines established by the Central Valley <br /> Regional Water Quality Control Board(CVRWQCB) and the San Joaquin County Environmental <br /> Health Department(EHD)for the subsurface investigation of underground storage tank(UST)sites <br /> and sampling of ground water monitoring wells,respectively <br /> 1 <br /> 2 1 WELL MONITORING AND EVACUATION <br /> ' On 30 September 2002, a Solmst water level meter was used to measure the depth to ground water <br /> in monitoring wells MW-1 through MW-5 relative to the tops of the well casings <br /> 1 After ground water depth measurements were collected, monitoring wells MW-1 through MW-4 <br /> were purged using dedicated, disposable plastic bailers, well MW-5 was purged with a two-stage <br /> ' PVC pump Between 21/4 and 3 gallons of water (a minimum of three casing volumes) were <br /> evacuated from wells MW-1 through MW-4,approximately 19 gallons ofwater were evacuated from <br /> MW-5 Ground water temperature, pH and conductivity were measured at 3/4-to 5-gallon intervals <br /> ' during purging using an Oakton water analyzer Field data and logs are included in Appendix B <br /> ' 2 2 GROUND WATER SAMPLE COLLECTION <br /> ' Water samples were collected from the monitoring wells using dedicated,disposable plastic bailers <br /> after allowing the wells to achieve a minimum 80% recovery of the pre-purge water volume <br /> 1 Advanced GeoEnvi ron mental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.