Laserfiche WebLink
' 17 February 2004 <br /> AGE-NC Project No 96-0254 <br /> Page 4 of 10 <br /> On 19 January 2000, wells MW-1, MW-2, MW-3 and MW-4 were sampled TPH-g, TPH-d and <br /> BTEX compounds were not detected in the ground water samples collected and analyzed from wells <br /> MW-1 through MW-4 MTBE was detected in the ground water samples collected from wells MW-1, <br /> MW-2 and MW-3 Concentrations of MTBE ranged from 200 micrograms per liter(µg/1)to 9,800 <br /> ' µg/1 in samples collected from monitoring wells MW-1,MW-2 and MW-3 Analytical results of the <br /> ground water samples collected from the site from January 2000 to July 2003 are presented in Table <br /> 4 and Table 5 <br /> On 12 October 2000, three soil probe bonngs (B7 through B9) were advanced at the site Bonngs <br /> ' were advanced to a depth of 50 feet bsg Soil samplk�e��,,s_were collected at 5-foot intervals,beginning y <br /> at a depth of 30 feet bsg MTBE was detected in tWof the soil samples analyzed by EPA Method 7/z <br /> 8020 and was detected in four soil samples analyzed by EPA Method 8260B The detected MTBE <br /> concentrations ranged from 5 1µg/kg to 52 µg/kg The highest detected MTBE concentration was <br /> from soil collected at 30 feet bsg in the area of well MW-1,the location of highest dissolved MTBE <br /> Analytical results of soil samples collected from the January 2000 investigation are presented in <br /> ' Table 2 MTBE was detected in the grab water sample from boring B8 collected from 50 feet bsg, <br /> at 29 µg/1 by EPA Method 8260 MTBE was not detected in the other grab ground water samples <br /> Analytical results of the grab ground water sample collected from boring B-8 is presented in Table 3 <br /> On 11 December 2000, ground water monitoring wells MW-5 and MW-6 were installed on-site to <br /> assess the lateral extent of MTBE-impacted ground water Soil samples were not collected'dunng <br /> the well installations <br /> On 20 December 2000,ground water extraction well EW-1 was installed at the site for performance <br /> of a ground water pumping test Soil boring EW-1 was advanced vertically to depths of 30 feet bsg <br /> Boring EW-1 was single-completed as a 6-inch diameter ground water extraction well with screen <br /> intervals between 15 and 30 feet bsg Soil and ground water samples were not collected during this Y <br /> investigation <br /> On 29 March 2001,groundwater monitoring wells MW-5 and MW-6 and extraction well EW-1 were <br /> sampled TPH-g, TPH-d and BTEX compounds were not detected In the ground water samples <br /> collected and analyzed from wells MW-5, MW-6 and EW-1 MTBE was detected in the ground <br />' water samples collected from MW-5 and EW-1 at concentrations of 16 µg/1 and 2,200 µg/l, <br /> respectively MTBE was not detected in the sample collected from well MW-6 <br /> On 01 November 2002, ground water monitoring wells MW-7 and MW-8 were installed off-site to <br /> further assess the lateral extent of MTBE-impacted ground water Soil samples were not collected <br /> during the well installations <br /> On 09 December 2002, ground water monitoring wells MW-7 and MW-8 were sampled TPH-g, <br /> TPH-d and BTEX compounds were not detected in the ground water samples collected and analyzed <br />' Advanced GeoEnvironmental,Inc <br />