My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005010
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2020 1:08:36 AM
Creation date
3/17/2020 2:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005010
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 08 January 2004 <br /> AGE-NC Project No 95-0103 <br /> Page 3 of 8 <br /> In addition, the effluent samples were analyzed for pH In accordance with EPA Method 150 1 and <br /> total petroleum hydrocarbons quantified as diesel (TPH-d) by EPA Method 8015 Modified <br /> 2R MONITORING AND SAMPLING <br /> 3 QUARTERLY GROUND WATE <br /> On 28 November 2003,ground water monitoring and sampling were performed on monitoring wells <br /> MW-1 through MW-6 at the request of the EHD <br /> 2 3 1 Well Monitoring and Evacuation <br /> A Solinst water level meter was used to measure the depth to ground water In monitoring wells <br /> MW-1 through MW-6 relative to the tops of the well casings(Table 1) The ground water elevation <br /> In each well was calculated by subtracting the measured depth to ground water from the surveyed <br /> casing elevation I <br /> . After water levels were measured,ground water(amlmmum of three casing water-volumes per well) <br /> were evacuated (purged) from wells MW-1, MW-3, MW-4 and.MW-5 Well MW-1 was purged of <br /> 28 gallons utilizing a waterra lift-bailer Wells MW-3,MW-4 and MW-5 were purged of 7,4 and 9 25 <br /> gallons of water, respectively, utilizing polyethylene disposable bailers <br /> Temperature,pH and conductivity were measured for stabilization at regular purge-volume intervals <br /> from each well using an Oakton water analyzer,the field measurements are Included In Appendix B <br /> Purged water was subsequently treated through the on-site ground water treatment system <br /> 2 3 2 Ground Water Sample Collection and Analysis <br /> Water samples were retrieved from each purged well using the dedicated disposable bailers after <br /> allowing the well to achieve a minimum of 80 percent recharge prior to sample collection The <br /> samples were transferred Into 40-m1 EPA-approved VOA vials containing 0 5 ml of 18%hydrochloric <br /> acid as a sample preservative The samples were properly labeled and transported In a chilled <br /> container under chain-of-custody to CTEL a DHS-certified laboratory,for analysis The groundwater <br /> samples were analyzed for <br /> TPH-g In accordance with EPA Method 8015 Modified and <br /> • BTEX and MTBE In accordance with EPA Method 8260 <br /> Advanced GeoEnviron mental,Inc <br /> F <br />
The URL can be used to link to this page
Your browser does not support the video tag.