Laserfiche WebLink
�} g March 199103 <br /> AC1E NC-95 _ <br /> 3 of 6 _` - - - _ <br /> i or extraction would be a viable - <br /> Y SEACOR concluded that ap the Clot test indicate <br /> lfort circuiting of V W-1, e data collected at tl during <br /> site However,because <br /> Ijespite the s acted soil at the site Th y <br /> rates could be achieved at t11 resentatives <br /> y =remediation alternative foz inlp during the vapor extraction test, reP should be <br /> - SENCOR IAS) pilot study - } <br /> - that sufl'ici�nt flow aild I1yd obtained by°very air s arging { <br /> - of`the inconclusive obtained_ 24-hour SVEliri-situ p T <br /> of, he plISlEHD indicated that a <br /> - rc <br /> - performed _ _ SEACOA in Julie or July <br /> =, - —` 1zi test)y=as performed at the site by three surrounding <br /> low h3 ti <br /> was measure in hydraulic <br /> -A ground water test(pu_ P the test indicating race at the,site _ <br /> water was extracted from MSV" Merl dad <br /> of influ <br /> J 94-Grouxld . observed 1 _1 had little <br />- � 19 - g �"�as Pram M� y be ineffective _ <br />` — wells Very slow 'Charge e w11 ing woo;d likel <br /> COR concluded that P p L remediation re aced by <br /> _conductivity` SEA and treat system of groundwat^r x <br /> a ump est and pumP test were In in the PA Prep <br /> Therefore, P or extraction pilot t _ � <br /> -- Desctiptian of the vapor - t <br />-� - - ical Audit Services,Irc (GAS) <br /> SEACOR. _ 1995 by Geolog feted as an air <br /> ane hc)ring was cQnlp <br /> $were iilstalled at the site in Janua"y well(VE_2}, v,7ell(ASO- <br /> 1),two <br /> Five boring - or eXmir io i z n ,sere atkon_ observation well <br /> rias completed as'a uaP feted as an akr SPargin ar in <br /> _ x Oiie boring _ 0 boring was corn <br /> - - well or exti action well and dit air sp g F ` <br /> sparging - <br /> s were ducl_c+anlpleted,each with a vapor , <br /> boring VE-3 ASO-2) - - f The extraction unit <br /> L y1.ASO-3 and - erforined extracted <br /> - - <br /> - flat test was p, H In the e <br /> - -- 1 1995 24-hour SVE and IAS p Concentrations of m Influence was <br /> - - On"14 and 15 January ar in was performed at 80 against the w <br /> /l (9, to 15,6$0 pp fatted ag <br /> ppmv <br /> ected to V E-1 s air"sp g g was p <br /> was cOnn _ a/1 t0 5E?,000 ��a <br /> 1 The induced vacuum be <br /> M1�,apar ranged from 35,040 = ar ing at AS-1 <br /> -3 _more thai190 feet east of VE- r s g <br /> adios of influence at the site was calculate to <br /> _measured at M - as estimated far a P <br /> milts Data gathered indicate <br /> _. thus of influence of 20 to 30 feet tiring p lira acted <br /> e traction point Thee ec iv e <br /> L-- distance to t11e37 feet Ara - <br /> _ approximately en concentrations at surrounding m d findings were <br /> ved oxygen de a viable alternative for reumreedi�on of p <br /> "based©il dissol VE should provide Pilot test proced <br /> - that IAS, combined with S VE/IAS P r <br /> undwater at the site' A�iell installation and S <br /> gro prepared by GAS <br /> described in a Final Re►ne dial <br /> ate P p J <br /> -- " V 11,4STALLATIO-N - <br /> JS-- 1�MEDIATION SYSTEM y a s LBl and <br /> _ to b Iaush GeoseieiSces Bo'�ng round _ <br /> � sere installed at the site Y_ LB3 was carripleted as g <br /> March 1996,three Borings born - <br /> --On 47 Ivlar - ed as p Summarized in <br /> a JuIY 1996 jnferim InvestigatEorz <br /> t va or_extract�on wells VES and VE6, g <br /> �1.,B2 were comple _ Procedures were <br /> awe11MN 5 <br /> - <br /> —water rnonitorin� _ - _ <br /> at er t pfepared by Lush Geoseaenc es^ <br />