My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005157
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MONTE DIABLO
>
1766
>
2900 - Site Mitigation Program
>
PR0535112
>
ARCHIVED REPORTS_XR0005157
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2020 11:38:11 PM
Creation date
3/17/2020 3:04:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005157
RECORD_ID
PR0535112
PE
2957
FACILITY_ID
FA0020296
FACILITY_NAME
CHAPIN BROTHERS INC
STREET_NUMBER
1766
STREET_NAME
MONTE DIABLO
STREET_TYPE
AVE
City
STOCKTON
Zip
95203
APN
13505050
CURRENT_STATUS
01
SITE_LOCATION
1766 MONTE DIABLO AVE
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> Mr Russell F Chapin, Sr <br /> May 15, 1995 <br /> Page 4 <br /> • The annular space of the well will be packed with sorted sand to a point approximately <br /> 0 5 ft above the top of the perforated casing A 2-ft thick plug consisting of bentonite pellets or <br /> chips will be placed above the sand in the wells to prevent cement from entering the sand pack <br /> The remaining annulus will be backfilled with a mixture of neat cement and powdered bentonite <br /> (<5%)to grade <br /> DESIGN AND INSTALL YSTEM <br /> The remedial system selected for installation will be designed, permitted, and installed <br /> This phase will include appropriate negotiations with agencies regulating soil and groundwater <br /> assessment and cleanup projects, air emissions, sewer disposal of treated water, and others The <br /> system recommended is capable of extracting and treating both soil vapor and groundwater, and <br /> will include subgrade trenches for extraction and sparging lines <br /> Chapin Bros Inc will be presented with comparative costs of purchasing or renting <br /> equipment for the site It is our judgement that the site could make use of an internal combustion <br /> engine for a period not likely to exceed 3 months, after which it would be appropriate to replace <br /> the engine with a blower using activated carbon as the primary emissions control method Based <br /> on an estimated duration of the remedial action exceeding one year, it is our recommendation <br /> that the engine equipment be leased or rented and that the air spargmg equipment be purchased <br /> If purchased, the equipment would be available after completion for resale or buyback by the <br /> manufacturer The equipment will be designed to be easily transported or stored <br /> OPERATE AND MAINTAIN SYSTEM <br /> The system will be operated and maintained at minimum monthly intervals with quarterly <br /> reports of system performance <br /> VERIFICATION SAMPLING <br /> Progress sampling was requested in the request for bid, which was to consist of drilling <br /> soil borings and evaluating selected soil and/or groundwater samples We have presented <br /> estimates of costs for drilling four soil borings and collecting and analyzing two soil samples per <br /> boring <br /> 4058"P2 LUSH GEOSCIENCEs <br />
The URL can be used to link to this page
Your browser does not support the video tag.