Laserfiche WebLink
28 October 1997 <br /> AGE-NC Project No. 95-0103 <br /> Page '.) of 3 <br /> UNIT CONDITIONS AND OPERATIONS <br /> • Repairs made to the King-Buck soil vapor extraction (SVE) unit during the past quarter <br /> included the overhaul of the pneumatic blower and electric motor, and repair of a <br /> manufacturing defect affecting the control panel of the SVE unit, thereby increasing the <br /> operating time of the SVE unit. <br /> • This SVE unit is equipped with a natural gas ignited pre-heater, which is fed oxygen from <br /> the vent gas pulled from the vapor extraction veils. Due to overall low oxygen <br /> concentrations in the vent gas, a small quantity of ambient air must be introduced into the <br /> SVE combustion train to allow the pre-heater to remain ignited. >~ai4lre of the pre-heater <br /> flarne will cause a shut down of the SVE unit. The ambient air or makeup gas introduced to <br /> maintain combustion, a result of the design limitations of the SVE unit, reduces the o,,erall <br /> vacuum exerted by the SVE unit, thereby reducing the zone of influence of each well and <br /> pulling hydrocarbons more slowly from the vadose zone. The frailties of the SVE unit have <br /> increased the support time required to observe and maintain the continual operation of the <br /> SVE unit beyond that initially anticipated. <br /> • Over the later portion of the month of September and through the month of October 1997, <br /> -- the SVE unit has operated with less than t elve lours of non-operational time. Through the <br /> third quarter of 1997, a total of 5461 lbs. or 87 gallons of hydrocarbons as gasoline were <br /> removed by the SVE unit. The mass calculations are included in the {quarterly Report for <br /> August 1997. <br /> DISCUSSION <br /> • The recent rise in ground water at the site has reduced the effectiveness of the soil vapor <br /> extraction system, limiting the zone of vapor removal to a Iow permeable silt/clay and <br /> increasing the volume of impacted soil to be addressed by the 1AS system. The new site <br /> conditions will increase the time required to remove the major portion of the hydrocarbon <br /> mass from the site. Noting that the unit has currently not operated with a stable status for <br /> more than thirty days,a review of the SVE effectiveness and expected duration is anticipated <br /> for March of 1998, to allow for a minimum of six months of stable operation. <br /> • The reported utility operational costs have been approximately $1,000 for the operation of <br /> the SVE unit and 1AS ground water system. Based on observed operating costs for similar <br /> SVE/IAS technologies at other remediation sites, this utility cost is reasonable for the <br /> removal of the estimated quantity of hydrocarbons from the Chapin site. Additionally; the <br /> overall cleanup costs for this site have been minimized by the utilization of this King-Buck <br /> Advanced CeoEnvironmental,Inc. <br />