Laserfiche WebLink
CHAPIN BROTHERS, INC. <br /> May 25, 1995 <br /> Page 4 <br /> water, Two passive product skimmers will be installed in monitoring wells MWX and MW2 to <br /> remove free product present in ground water. <br /> Miscellaneous equipment will Consist of flow meters, vacuum, pressure and temperature gauges, <br /> valves, a water-knockout tank, high temperature and water level automatic shut-off switches and <br /> sample ports. The vapor extraction and air sparging equipment will be placed inside an enclosure <br /> contained within a six-foot-high chain link fence with redwood slats. <br /> Complete system design and construction drawings for the vapor extraction and air sparging <br /> systems will be prepared for permitting and construction purposes. We will procure all necessary <br /> equipment and materials for a fully operational air sparging system, We will coordinate and <br /> supervise the installation of the treatment system. System installation activities will take <br /> approximately one week to complete. <br /> Afar the SIVUAPCD authority to construct and building permit are obtained the air sparging <br /> wells and vapor extraction wells will be connected to the air sparging blower and internal <br /> combustion engine, respectively, via underground piping. We will procure all necessary <br /> equipment and materials for fully operational vapor extraction and air sparging treatment systems. <br /> We will coordinate and supervise the installation of the treatment systems. System installation <br /> activities will take approximately one to two weeks to complete. <br /> After the SJVUAPCD permit to operate is obtained, the treatment systems will be started, <br /> Measurements will be taken from the internal combustion engine to determine the influent and <br /> effluent gas flow rates. Influent and effluent air samples will be collected before and after the <br /> emissions control device. The air samples will be submitted to a California-certified laboratory <br /> for analysis of Total Petrolewn Hydrocarbons (TPH) as gasoline using Modified EPA Method <br /> 8015 and Benzene, Toluene, Ethylbenzene, and Total Xylenes (BTEX� using Modified EPA <br /> Method 8020. After analytical sampling results of air samples are returned from the laboratory, <br /> an emission verification report will be prepared for submittal to the SJVUAPCD approximately <br /> two weeks after collecting air samples, The emission verification report will contain flow rate <br /> calculations, results of laboratory analysis and the system destruction efficiency. <br /> Start-up procedures include electrical and mechanical checks to verify normal operation of <br /> equipment and a system performance check (Le., verification of design vacuums, pressures, and <br /> flow rates). System start-up will follow established SJVUAPCD procedures. If proper <br /> IRS <br /> :x:rd(a xr WALLACG-KUHL <br /> 6ASSOCIATES INC. <br />