My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0013013
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MINER
>
3310
>
3500 - Local Oversight Program
>
PR0545561
>
ARCHIVED REPORTS_XR0013013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2020 10:55:26 PM
Creation date
3/17/2020 4:25:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0013013
RECORD_ID
PR0545561
PE
3528
FACILITY_ID
FA0009490
FACILITY_NAME
KENTS OIL SVC INC
STREET_NUMBER
3310
Direction
E
STREET_NAME
MINER
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
14339005
CURRENT_STATUS
02
SITE_LOCATION
3310 E MINER AVE
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
271
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Mr. Mike Collins <br /> July 9, 1993 <br /> Page 2 <br /> [t. <br /> I <br /> • Excavated soil will be stockpiled on site, next to the existing biocells, and covered <br /> by plastic. <br /> • The geotechnical expertise of Kleinfelder, Inc. will be used to assure a safe and <br /> proper excavation. <br /> i <br /> • After confirmation that all impacted-soil has been removed from the excavation, <br /> the bottom 20 to 25 feet of the excavation will be backfilled with free-draining <br /> gravel. After placement, the gravel will be submitted to vibratory compaction for <br /> several hours to ensure settlement. The treated soil from the biocells will then be <br /> used to backfill the remainder of the excavation. ' Soil will be placed in the <br /> excavation in 1-foot lifts and compacted to proper density. Density measurements <br /> will be conducted b Kleinfelder, Inc. <br /> 1 <br /> y I <br /> • The stockpiled soil will be placed in the biocells as soon as they are empty and <br /> will be subjected to "bioremediation" as per the existing Work Plan. <br /> • <br /> Either you or another San Joaquin County representative will be contacted before <br /> any new phase of work commences at the site. <br /> Your prompt approval of this addendum to the existing Work Plan at the subject site will be <br /> L. appreciated. If you have any questions, please contact me at (916) 444-0123. # <br /> Sincerely. <br /> LBROWN AND CALDWELL <br /> k <br /> gi *y <br /> 4iceoIogist <br /> LP:Ik <br /> cc: Mr. Pat Cullen, Brown and Caldwell v <br /> Mr. Les Smith, Kause Construction <br /> Brawn and Caldwell 7058�REPORMW ORK-PL.N-AD D <br /> { <br /> L�_nsultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.