My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012598
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0012598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:48:13 PM
Creation date
3/17/2020 4:52:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012598
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. tr <br /> -- <br /> GOLDEN GRAIN COMPANY 4 S <br /> December 21, 1989 <br /> 202/799-5045.06 <br /> ding, to the east of the former tank pit. The extracted ground- <br /> water will be treated on site prior to discharge, if necessary. <br /> Prior to the preparation and submission of a Final Remedial <br /> Plan (FRP) , several steps will be taken. To assure proper system <br /> design, installation, and performance, additional data will be <br /> collected and field work performed. Data gathered during this <br /> phase could also be useful if a scientifically based health-risk <br /> assessment is performed to establish final cleanup criteria that <br /> will safeguard the public health and welfare. All work will be <br /> -. performed in accordance with applicable regulations and guide- <br /> lines. <br /> Interim work steps that will be accomplished while the FRP <br /> is being prepared include: <br /> 1. Salvaging MW-9 and collecting and analyzing groundwater <br /> samples from the well to define the northeastward <br /> extent of the dissolved hydrocarbon plume <br /> 2. Measuring groundwater elevations monthly in all site <br /> wells <br /> 3. Quarterly sampling and analyses of groundwater from one <br /> of MW-1 through MW-4, and from all other monitoring <br /> wells at the site (excluding those containing any SPF) <br /> 4. Removing any accumulated sPP by periodic bailing <br /> 5. Performing soil-vapor extraction tests <br /> 6. Designing a soil-vapor extraction system <br /> GROUNDWATER <br /> ,......., TECHNOLOGY INC. '. <br /> s� <br />
The URL can be used to link to this page
Your browser does not support the video tag.