My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0012598
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MOFFAT
>
229
>
3500 - Local Oversight Program
>
PR0545566
>
ARCHIVED REPORTS_XR0012598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2020 11:48:13 PM
Creation date
3/17/2020 4:52:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012598
RECORD_ID
PR0545566
PE
3528
FACILITY_ID
FA0005479
FACILITY_NAME
MANTECA BEAN CO
STREET_NUMBER
229
STREET_NAME
MOFFAT
STREET_TYPE
BLVD
City
MANTECA
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
229 MOFFAT BLVD
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
657
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P <br /> r - <br /> Golden Grain Company <br /> ,dune 2, 1989 <br /> 202/799-5045.01 <br /> 4.5 HYDROGEOLOGYC PARAMETER INVESTIGATION <br /> Upon completion of the well installations and sampling, the <br /> h following work steps will be conducted to determine the site <br /> hydrogeologic conditions: <br /> 1) Monitor water levels in all wells associated with the <br /> site. <br /> 2) Conduct one baildown test to define aquifer parameters. <br /> After the wellheads have been surveyed, water-level measure- <br /> ments will be collected in all wells to allow calculation of <br /> water elevations, Groundwater contour maps will then be con- <br /> structed to show the groundwater flow direction and gradient. <br /> Additionally, comparison of the water elevations in adjacent <br /> wells that are screened through different depths (the shallow <br /> wells versus the deep well) will be used to determine if vertical <br /> gradients exist. <br /> The baildown test will be performed by removing a known <br /> volume of water and monitoring groundwater elevations versus time <br /> with a pressure transducer probe as the system re-attains <br /> equilibrium. The data will then be analyzed to calculate the <br /> aquifer parameters. <br /> 5.0 PROBLEM ASSESSMENT REPORT <br /> At the conclusion of the field work described above, a <br /> Problem Assessment Report (PAR) will be compiled, presenting all <br /> information..gathered .about....the.site....._The PAR will include <br /> v. 11 <br /> - GROUNDWATER <br /> _- TECHNOLOGY.LNC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.