Laserfiche WebLink
r <br /> I <br /> gm 06 <br /> ins%:allation activities with the San Joaquin valley Health <br /> District in Stockton and the Regional Water Quality <br /> _ control Board in Sacramento. our proposed well <br /> installation plan for Manteca Bean was reviewed by the San <br /> Joaquin valley Health District then forwarded to the <br /> Regional Water Quality Control Board for their input, <br /> After review by these regulatory offices, the well permit <br /> application was approved in early May 1987. <br /> ^^f Ground penetrating radar was used to identify underground <br /> obstructions or utilities undersround. The survey' was <br /> conducted by 21orCa1 Geophysical on April 15, 1987 and <br /> completed that same day. The results of the survey are <br /> presented in Appendix A. <br /> Aerial photographs for the site and surrounding <br /> area were <br /> i <br /> obtained for the purpose of locating other underground <br /> storage tanks and/or water wells in the Manteca Bean site <br /> vicinity. Plate 1 is a photo view of the Manteca Bean <br /> site area. <br /> B. Borin s and Well installations 1987 <br /> Test borings and well installations began on May 28, <br /> and were completed the same day. Two groundwater <br /> Mobile B-51 drill <br /> monitoring <br /> wells werE Installed tsing a <br /> ---�- - <br /> rig with hallow stems- auger nathads.----__.4,-_..1. locations an <br /> 2 <br /> } <br /> k <br />