Laserfiche WebLink
Primex Ordnance and Tactical Systems <br />EPA ID No.: CAD006626762 <br />Draft Hazardous Waste Facility Permit <br />W <br />SWMU Nos. �nder <br />through 9 have been certified closed by the Department and require no <br />further action this section. <br />SWMU Nos. 11 through 20 and AOC No. 1 are unlikely to have created soil or water <br />contamination, and AOC No. 2 has been properly remediated, therefore no further action <br />is recommend d for these units. <br />SWMU Nos. 10 and 21 and AOC Nos. 3, 4 and 5 have or may have released hazardous <br />wastes or constituents in the environment. Soil samples should be taken and analyzed for <br />constituents of concern. The vertical extent of contamination should also be determined <br />so that the potential impacts to groundwater can be evaluated. <br />1. Within 1 <br />project c <br />for overs <br />with this <br />absence. <br />commun <br />reports, <br />pursuant <br />2. The Per <br />changing <br />days of the effective date of this permit, the Permittee shall designate a <br />ordinator and shall notify the Department in writing of the project <br />)r it has selected. The Permittee's project coordinator shall be responsible <br />eing the implementation of corrective action at the Facility in accordance <br />)art of the permit and for designating a person to action in his/her <br />The Department will also designate a project coordinator. All <br />rations between the Permittee and the Department, and all documents, <br />Vrovals and other correspondence concerning the activities performed <br />o this part of the permit shall be directed through the project coordinators. <br />iittee shall provide at least 7 days written notice to the Department prior to <br />project coordinator. <br />IN <br />TABLE 3: AREAS OF CONCERN <br />AOC NO. <br />DES <br />RIPTION <br />CONSTITUENTS OF <br />RECOMMENDATIONS <br />CONCERN <br />I <br />Photo <br />Waste Water Tanker and <br />silver <br />no further investigation <br />S ill <br />rea <br />2 <br />Pink <br />Water Spill Area <br />water contaminated with <br />no further investigation <br />TNT and other <br />explosives <br />3 <br />Site of <br />Two Tests <br />beryllium <br />area be characterized <br />4 <br />Fuel <br />Storage Area <br />diesel fuel <br />confirmatory samples be <br />taken <br />5 <br />Dies1 <br />Fuel Leak Area <br />diesel fuel <br />confirmatory samples be <br />taken <br />W <br />SWMU Nos. �nder <br />through 9 have been certified closed by the Department and require no <br />further action this section. <br />SWMU Nos. 11 through 20 and AOC No. 1 are unlikely to have created soil or water <br />contamination, and AOC No. 2 has been properly remediated, therefore no further action <br />is recommend d for these units. <br />SWMU Nos. 10 and 21 and AOC Nos. 3, 4 and 5 have or may have released hazardous <br />wastes or constituents in the environment. Soil samples should be taken and analyzed for <br />constituents of concern. The vertical extent of contamination should also be determined <br />so that the potential impacts to groundwater can be evaluated. <br />1. Within 1 <br />project c <br />for overs <br />with this <br />absence. <br />commun <br />reports, <br />pursuant <br />2. The Per <br />changing <br />days of the effective date of this permit, the Permittee shall designate a <br />ordinator and shall notify the Department in writing of the project <br />)r it has selected. The Permittee's project coordinator shall be responsible <br />eing the implementation of corrective action at the Facility in accordance <br />)art of the permit and for designating a person to action in his/her <br />The Department will also designate a project coordinator. All <br />rations between the Permittee and the Department, and all documents, <br />Vrovals and other correspondence concerning the activities performed <br />o this part of the permit shall be directed through the project coordinators. <br />iittee shall provide at least 7 days written notice to the Department prior to <br />project coordinator. <br />IN <br />