My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
32727
>
2200 - Hazardous Waste Program
>
PR0514043
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2020 11:56:40 AM
Creation date
3/18/2020 11:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514043
PE
2220
FACILITY_ID
FA0009809
FACILITY_NAME
FIREWORKS AMERICA TRACY
STREET_NUMBER
32727
Direction
S
STREET_NAME
CORRAL HOLLOW
City
TRACY
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
32727 S CORRAL HOLLOW
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Inspection Report; Physics International <br />Inspection of November 14, 1996 <br />Page 8 <br />VIII. SAMPLING SUMMARY <br />No samples were taken. <br />%I. DISCUSSION WITH MANAGEMENT: <br />After t e site tour I prepared a Summary of Violations (SOV). <br />As noted in the Observations (Section VI), I did not write a <br />violation f r failure to note the actions taken to correct <br />deficiencies noted in the inspection records because the facility <br />was acting as generator only at the time. Mr. Cayere and Mr. Meier <br />agreed to mak sure corrective actions were noted in the log in the <br />future. I i itially gave the facility ten days to correct the <br />violations si ce correction was relatively simple. I discussed the <br />SOV and the c rrective actions with Mr. Cayere and Mr. Meier. They <br />agreed to t e corrective actions but asked for 15 days for <br />correction b cause of the upcoming holidays. I agreed to this <br />extension. I should be noted that the open drums had been closed <br />and that the hazardous waste labels had been affixed to the drums <br />before I lef the facility. <br />In a letter dated December 2, 1996 (Attachment 4), Mr. Cayere <br />outlined the Iactions taken to correct the violations in the SOV. <br />The signed certification of correction was inadvertently left out <br />when the lettler was originally mailed; it was mailed separately on <br />December 4, 996. This completes the corrective actions required <br />for the viol tions observed during this inspection. <br />X. ATTACHMENTS: <br />1. Location and Site Maps. <br />2. Photographs (2). <br />3. Summary of Violations. <br />4. Response to Summary of Violations. <br />RA1.1 • - Y/1-�.. <br />Curtis A. Yount <br />Hazardous Substs// es Engineer <br />Rick Robison Date Approved <br />Unit Chief <br />
The URL can be used to link to this page
Your browser does not support the video tag.