My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CORRAL HOLLOW
>
32727
>
2200 - Hazardous Waste Program
>
PR0514043
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2020 11:56:40 AM
Creation date
3/18/2020 11:42:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0514043
PE
2220
FACILITY_ID
FA0009809
FACILITY_NAME
FIREWORKS AMERICA TRACY
STREET_NUMBER
32727
Direction
S
STREET_NAME
CORRAL HOLLOW
City
TRACY
Zip
95304
CURRENT_STATUS
02
SITE_LOCATION
32727 S CORRAL HOLLOW
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Project Description <br />Between 1987 and 1992, two sites on company property were used as treatment and disposal <br />units for explosive w tes. Table 1 summarizes description of each site. <br />Table 1 <br />S Y DESCRIPTION OF HAZARDOUS WASTE SITES <br />Type of site <br />Hazardous Waste <br />Constituent(s) of concern <br />Quantities <br />and/or years in use <br />Open Burn Vessel <br />Explosive- <br />Heavy metals such as <br />600 pounds per month for 5 <br />contaminated <br />lead and cadmium, 2,4 <br />years <br />material and <br />DNT and 2,6 DNT <br />explosive wastes <br />Open Detonation <br />Explosive wastes <br />2,4 DNT, 2,6 DNT and <br />100 pounds per month for 5 <br />Pit <br />undetonated explosives <br />years <br />"I Dinitrotoluene <br />Closure activities will consist generally of two steps: <br />1. Characterizatio of each site to determine the extent of contamination by sampling and <br />analysis of soil. <br />2. Removal and di posal of all hazardous waste and contaminated soil at a permitted facility. All <br />excavations will be back-filled with clean soil. <br />At this time, the goal o the project is clean closure. However, if extensive contamination is found <br />during site characterization, other closure alternatives such as capping will be considered. <br />Closure activities will <br />will oversee closure a <br />IV. Enforcement <br />DTSC inspected <br />April 1986, July 1989, . <br />regulations were found <br />drums, inadequate conti: <br />deficiencies were of mir <br />imposed. <br />performed as outlined in the closure, and health and safety plans. DTSC <br />iysics International Company on February 1984, April 1984, January 1985, <br />gust 1989, April 1991. Violations of the hazardous waste statutes and <br />the facility. Documented violations included: unlabeled drums, open <br />;ncy plan, and lack of adequate waste analysis plan. In all cases <br />nature. Violations were corrected in a timely manner and no fines <br />April 28, 1993 1 Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.