2 0 SCOPE OF WORK <br /> 1 <br /> The project objectives were to further define the extent of impacted soil and groundwater beneath <br /> ' the site and adjacent areas To achieve these objectives, soil and groundwater samples were <br /> collected for laboratory analysis from seven direct-push soil borings In addition, groundwater in the <br /> three existing on-site monitoring wells was monitored, sampled and laboratory-analyzed <br /> ' <br /> 21 Planning and Permittin <br /> 9 <br /> Prior to initiating fieldwork, a site-specific health and safety plan addendum was prepared according <br /> to 29 CFR 1910 120 The health and safety plan included safety procedures for work to be <br /> ' performed, chemical hazard information, site safety officers, and a medical emergency location <br /> To perform the proposed scope of work, drilling permits (SR #31980 and 31981) were obtained <br /> from EHD Since four of the soil borings were drilled on city property, an encroachment permit <br /> (#4453) was obtained from the City of Manteca Public Works Department Copies of the approved <br /> ' permits are included in Appendix A <br /> At least two working days prior to field work, EHD was notified so that any inspections could be <br /> scheduled Underground Service Alert was also notified so that underground utilities could be <br /> located and marked <br /> ' <br /> 22 Soil and Groundwater-Grab Sampling and Analysis <br /> p 9 Y <br /> ' On December 5 and 6, 2002, under the supervision of Ramage Environmental and inspection of <br /> EHD, Fisch Environmental (C-57 License#683865) advanced seven soil borings with a Geoprobe® <br /> ' 6600 Direct-Push Technology rig (Geoprobe), to evaluate the distribution and extent of petroleum <br /> hydrocarbons in subsurface soil and groundwater As indicated on Figure 2, one soil boring (G-6) <br /> was drilled next to the former USTs, and six sod borings (G-7 through G-12) were drilled <br /> approximately 100 to 150 feet from the former USTs <br /> ' The soil boring (G-6) drilled next to the former USTs was advanced directly to the sandy gravel, <br /> second groundwater-bearing interval at approximately 44 feet bgs, for discrete groundwater <br /> ' sampling only The soil boring (G-8) was advanced to approximately 30 feet bgs and the other five <br /> soil borings were advanced to approximately 25 feet bgs for soil and groundwater-grab sampling <br /> 9 <br /> i <br /> 1 <br /> 1 <br />