My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013077
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BECKMAN
>
14273
>
2600 - Land Use Program
>
RA-89-10
>
SU0013077
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 11:54:22 AM
Creation date
3/19/2020 11:49:01 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013077
PE
2600
FACILITY_NAME
RA-89-10
STREET_NUMBER
14273
Direction
N
STREET_NAME
BECKMAN
STREET_TYPE
RD
City
LODI
Zip
95240-
APN
06103032
ENTERED_DATE
3/10/2020 12:00:00 AM
SITE_LOCATION
14273 N BECKMAN RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ob, <br /> SAN JOAQUIN COUNTY <br /> DEPARTMENT OF PLANNING AND BUILDING INSPECTION <br /> 1810 E. HAZELTON AVE., STOCKTON, CA 95205CHET DAVISSON <br /> PLANNING PHONE: 209/468-3120Director <br /> BUILDING PHONE: 209/468-3123 JERRY HERZICK <br /> NEIGHBORHOOD PRESERVATION PHONE: 209/468-3021 Deputy Director <br /> RENE JACKSON <br /> Deputy Director <br /> TOM WALKER <br /> Deputy Director <br /> June 28 , 1989 <br /> � �ECFI V FD <br /> 'JUN <br /> lgi7 <br /> MEMORANDUM ENVIAO <br /> N PFnMMFNTq� NF <br /> SgL ry <br /> TO : Development Committee <br /> FROM: Planning Division <br /> SUBJECT : REVISION OF APPROVED ACTION FOR SITE APPROVAL <br /> APPLICATION NO. SA-87-20 OF THE ISLAMIC CENTER <br /> OF STOCKTON ( C/O ISLAMIC CEMETERY OF CALIFORNIA) <br /> -------------------------------------------------------------------- <br /> The Planning Division has reviewed the above-referenced application <br /> and recommends approval subject to the following conditions of <br /> approval : <br /> 1 . The project site shall be landscaped as indicated on the <br /> revised site plan dated March 13 , 1989 . The perimeter of <br /> Phase I shall be landscaped with a combination of trees and <br /> shrubs . In addition, a minimum 10-foot-wide landscaped strip <br /> adjacent to Beckman Road shall be required as part of Phase <br /> 1 -A landscaping . Trees shall be a minimum of 15 gallons in <br /> size , 1 " caliper and planted at least every 25 ' . <br /> Evergreen o-- deciduous trees can be used ; however , if Italian <br /> Cypress are to be used, they should be planted no more than <br /> 15 ' apart. Shrubs , a minimum of five gallons in size , shall <br /> also be planted between the trees . If a solid screen of <br /> Italian Cypress is preferred, shrubs may be clustered in other <br /> areas of the cemetery. The remaining area shall be planted in <br /> lawn and maintained via an automatic sprinkler system . <br /> 2 . The remaining portion of the project site , Phase II and 1 -B, <br /> may be available for agricultural use . As expansion of the <br /> cemetery is required into this area, the landscaping shall be <br /> extended in the same manner as Phase 1 -A. <br /> 3. All parking spaces , driveways , and maneuvering areas shall be <br /> paved and permanently maintained with asphaltic concrete. All <br /> parking spaces shall be delineated with paint. <br />
The URL can be used to link to this page
Your browser does not support the video tag.