My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MYRTLE
>
2731
>
2900 - Site Mitigation Program
>
PR0537457
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2026 2:59:56 PM
Creation date
3/19/2020 3:41:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537457
PE
2950 - ENVIRON ASSESS
FACILITY_ID
FA0021545
FACILITY_NAME
SAN JOAQUIN RTD/SARDEE VACANT LOT
STREET_NUMBER
2731
Direction
E
STREET_NAME
MYRTLE
STREET_TYPE
ST
City
STOCKTON
Zip
95205-4718
APN
15702002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2731 E MYRTLE ST STOCKTON 95205-4718
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PHASE II ESA WORK PLAN <br />2731 E. MYRTLE STREET <br />STOCKTON, CALIFORNIA <br />2.4 SOIL GAS SAMPLING <br />)MEST <br />EmirownwW Seices & iirtmlogy <br />Following soil sample collection, the borings will be advanced to the target depth for <br />construction of temporary vapor wells for the collection of soil gas samples (Figure 2-1). The <br />temporary vapor wells will be constructed within the borehole annulus following WEST'S SOPS <br />and CaIEPA's Advisory -Active Soil Gas Investigations. The soil gas samples, following an <br />approximate two-hour timeframe for the surrounding formation to equilibrate, will then be <br />collected into 1 -liter stainless steel laboratory -supplied and individually certified Summa <br />canisters outfitted with a flow control valve manifold. Field data forms will be maintained to <br />record purging and shut-in testing parameters prior to soil gas sample collection (Appendix B). <br />Following the soil gas sample collection, the Summa canisters will be transported to a SWRCB <br />ELAP certified laboratory for chemical analysis following ASTM D 4840 chain -of -custody <br />protocols. The soil gas samples will be analyzed for VOCs by USEPA Method TO -15 SIM and <br />helium tracer gas by ASTM D 1946. The target soil gas sample depths and suite of analytes are <br />presented in Table 2-1. <br />2.5 BORING DESTRUCTION <br />Following completion of soil and soil gas sampling, the temporary vapor wells will be <br />overdrilled to remove the vapor well materials (e.g., tubing, sand filter and bentonite) and the <br />borehole annulus grouted to the surface using a Portland Type II Cement/bentonite mixture in <br />accordance with the SJCEHD boring permit requirements. The top of the boreholes will be <br />completed to match the existing ground surface. <br />2.6 INVESTIGATION -DERIVED WASTES <br />Investigation -derived wastes including vapor well materials and soil cuttings will be placed in <br />United States Department of Transportation -approved containers and removed from the Site at <br />the completion of the drilling and sampling activities. The containers will be temporarily stored <br />5 <br />9123 <br />
The URL can be used to link to this page
Your browser does not support the video tag.