Laserfiche WebLink
THORNE�.-�• ENVIRONMENTAL <br /> Phase II - Field Operations <br /> A. Professional Services-Drilling Supervision <br /> 1. 2-eight hour days= 16 hours $ 1,040.00 <br /> Project Hydrogeologist @ 65/hr <br /> 2. Expenses @ $100/day $ 200.00 <br /> B. Drilling Services and Completion of <br /> Groundwater Monitoring Wells <br /> 1. Includes Drill Rig, Steam Rinse $ 8.300.00 <br /> Decon Trailer, 55 Gallon Drums <br /> Brass Sample Sleeves, Photoinonization <br /> Detector, and Well Completion Materials <br /> Sub-Total $ 9,540.00 <br /> Phase III - Analytical Services <br /> Soil <br /> . 2 samples per well = 6 samples <br /> EPA Method 8240/8270 <br /> 6 samples @ $660 ea $ 3,960.00 <br /> Water <br /> 1 sample per well = 3 samples <br /> EPA Method 624/625 <br /> 3 samples @ $600 ea $ 1,800.00 <br /> Sub-Total $ 5,760.00 <br /> Phase IV - Survey and Monitor Groundwater Elevations <br /> 1. 2-eight hour days = 16 hours $ 1,040.00 <br /> project hydrogeologist @ $65/hr <br /> 2. Survey of location $ 250.00 <br /> 3. Expenses @ $100/day $ 200.00 <br /> Sub-Total $ 1,490.00 <br /> 11/89 Y89-199 <br />