My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1240
>
3500 - Local Oversight Program
>
PR0545598
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2020 4:04:50 PM
Creation date
3/23/2020 3:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545598
PE
3528
FACILITY_ID
FA0001304
FACILITY_NAME
STOCKTON SCAVENGERS ASSOCIATION
STREET_NUMBER
1240
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
1240 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br /> Harlin Knoll [EH] <br /> From: Capps, Mark[Mark.Cap ps@aecom.com] <br /> Sent: Tuesday, September 29, 2009 9:36 AM F <br /> To: Harlin Knoll [EH] <br /> Subject: RE: 1240 Navy <br /> Hi Harlin <br /> Yes, there were two phases of well installation and the original 3 wells were destroyed by overdriling (MW-1 and <br /> 3)and pressure grouting (MW-2). Chronology and brief summary are provided below: <br /> r <br /> • May 1989 installation of MW-1, MW-2 and MW-3 by EMCON. <br /> • January 19, 1993 Mark Group submittal of Work Plan for Supplemental Soil and Groundwater Investigation <br /> and Soil Remediation to County EHD <br /> • January 23, 1993 EHD approval of Work Plan' <br /> • February 3, 1993 destruction and sealing of MW-1, MW-2, and MW-3 by the Mark Group <br /> • January, June and July 1993 Phases of soil excavation <br /> • .February 1, 1993 Mark Group submittal Abandonment of Monitoring Wells MW-1, MW-2 and MW-3 <br /> outlining destruction methods. <br /> • May 1993 installation of new MW-1, MW-2, and MW-3 by the Mark Group <br /> • October 1993 installation of MW-4 by the Mark Group <br /> I don't have the original EMCON well installation report, and it was.not available when we obtained County files or <br /> reviewed CVWB files. <br /> February 1, 1993 Mark Group Letter Re:Abandonment of Monitoring Wells MW-1, MW-2 and MW-3 outlines the <br /> well abandonment methods that will be used - MW-1 and 3 were proposed to be overdrilled and grouted; MW-2 <br /> was to be pressure grouted because it was within tli6 overexcavation area. <br /> The Mark Group June 17, 1994 Preliminary Closure Report(page 1-3 and page 4-1) references destruction and <br /> sealing of three pre-existing monitoring wells" No additional details are provided <br /> These other reports were obtained during EHD file review. <br /> Let me know if you need any additional information <br /> Mark Capps, PG <br /> Senior Project Manager <br /> AECOM Environment <br /> D: NOTE NEW TEMPORARY DIRECT LINE (916) 8304355 <br /> this number will be in effect until mid October <br /> C: (916)207-1290 <br /> rnark.capps@aecom._com- <br /> AECOM <br /> 10461 Old Placerville Rd Suite 170 <br /> Sacramento, CA 95827 <br /> T: (916) 362-7100 <br /> F: (916) 362-8100 <br /> www.aecom.com <br /> 9/29/2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.