Laserfiche WebLink
mrTHE <br /> MARK <br /> ik .R.UP <br /> ENGINEERS a GEOLOGISTS, INO Site-Specific Health and Safety Plan <br /> ENVIRONMENTAL MONTTORING EQUIPMENT <br /> Check if <br /> Required Tyne of Equipment When Recorded Where Recorded <br />' X Photo Ionization Detector During soil pile relocation air samples will be taken periodically 4 <br /> feet above ground surface immediately adjacent the down wind side <br /> t the soil stockpile At other times soil pile will remain covered with <br /> plastic sheeting <br /> _ Oxygen Monitor <br /> _ HNU <br /> OVA <br /> _ Field GC <br /> Scintillometer <br /> Gieger Counter <br /> _ Colorimetric Tubes <br /> _ Dosimeters/Film Badges <br /> _ Other <br /> COMPOUNDS AND CONCENTRATIONS ACTION LEVELS <br /> Project action levels are determined by the potential total petroleum hydrocarbons (TPH) levels that may be <br /> encountered during sampling Action levels will be determined using a flame ionization detector (FID) at the <br /> previously described sampling points The determined action levels' concentrations and corresponding courses of action <br /> are as follows <br /> 1 When air readings are found to be at or above 50 parts per million (ppm) half face respirators with <br />' organic vapor cartridges will be worn by all personnel <br /> 2 At concentrations of hydrocarbons in air of 500 ppm personnel will move away from the site and further <br />' evaluation of the site and procedures will become necessary It is not expected that this action level will be <br /> reached at any time during the project. <br /> 3 Third level of action would address the general public in the vicinity of the project site The potential for <br /> this level of action is extremely unlikely <br />