Laserfiche WebLink
THE <br /> MARK <br /> ROUP <br />' ENGINEE8S a GEOLOGISTS, INC Site-Specific Health and Safety Plan <br /> ONSITE CONTROL MEASURFS <br /> AUTHORITY <br /> Mr Ken Simas and Mr Walter Johe have been designated to coordinate access control and site security <br /> A safe perimeter around the drilling and excavation zones has been established as follows <br /> When work is being conducted, a 50 foot perimeter around the drill rig will regulate access No unauthorized persons <br /> 1 will be allowed within the vicinity of the work site Restrictions related to visitors and public access are specified in <br /> Section 8 2 and 8 3 of The MARK Group's Master Health and Safety Plan No person shall be admitted to the work <br /> site unless they are MARK project personnel, authorized contractor personnel, or client representatives <br /> No unauthorized personnel should be within this area <br /> COMMAND POST STAGING AREA <br />' The onsite Command Post and Staging Area have been established at <br /> Not applicable <br /> lieThe prevailing wind conditions are see site descri tion section <br /> The Command Post and Staging Area are upwind from the not applicable zone <br /> CONTROL BOUNDARIES <br /> Control Boundaries have been established and the Exclusion Zone, Contaminant Reduction Zone, and the Support <br />' Zone are designated as follows <br /> An exclusion zone will be installed around the perimeter of the excavation pits The purpose of this boundary is to <br />' prevent accidental entry into the pits In addition, a decontamination area will be designated on the site before work <br /> commences <br /> These boundaries are identified by <br /> Boundaries will be identified by cordoning tape <br /> 1 <br /> r <br /> i <br />