My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1130
>
2900 - Site Mitigation Program
>
PR0545514
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:59:39 PM
Creation date
3/24/2020 4:44:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545514
PE
2960
FACILITY_ID
FA0001254
FACILITY_NAME
DUTCH BROS COFFEE
STREET_NUMBER
1130
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95207
APN
10416031
CURRENT_STATUS
02
SITE_LOCATION
1130 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rally's Stockton Work Plan 4 <br /> Project No. 91349.A <br /> EPA METHOD CONSTITUENT MEDIA QUANTITY <br /> 8015 DIESEL SOIL 12 <br /> 8020 AROMATICS SOIL 12 <br /> 601 DIESEL WATER <br /> 602 AROMATICS WATER <br /> pH pH WATER <br /> FIELD TEMP TEMPERATURE WATER <br /> 4) Prepare a report describing the soil conditions, the <br /> method of investigation and the findings. <br /> The report would include all necessary supporting materials and graphics, <br /> including: soil logs, site plan, analytical results, and chain-of-custody forms. <br /> SITE DESCRIPTION <br /> The project is reached from Stockton, California by taking the U.S. Highway 99 <br /> south toward Stockton to Hammer Lane, traveling west to March Lane, turning <br /> south and traveling to March Lane. Project is the vacant lot on the south side <br /> of March Lane, adjacent to a BP Gas Station. The project site is a portion of <br /> parcel L as shown on parcel map 10-187, developed by R.P. Weldum & <br /> Associates, Inc. <br /> The Rally's Stockton project is situated within the Sacramento/San Joaquin <br /> Great Valley at and elevation of approximately 104 feet above mean sea level. <br /> Topography <br /> The topography within the project area is gently sloping to the southwest. <br /> Surface runoff is collected in a storm drainage system located along the <br /> western property boundary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.