My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1130
>
2900 - Site Mitigation Program
>
PR0545514
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2020 4:59:39 PM
Creation date
3/24/2020 4:44:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0545514
PE
2960
FACILITY_ID
FA0001254
FACILITY_NAME
DUTCH BROS COFFEE
STREET_NUMBER
1130
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95207
APN
10416031
CURRENT_STATUS
02
SITE_LOCATION
1130 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rally's Stockton Work Plan 3 <br /> Project No. 91349.A <br /> Area #3 <br /> Area #3 is located approximately 20 feet south of Area #1 , along <br /> the eastern property boundary. A hand auger boring will be <br /> excavated to a maximum depth of five feet below ground surface. <br /> Two soil samples will be collected from the boring and a water <br /> sample will be collected if water is encountered. <br /> Area #4 <br /> Area #4 is located approximately 45 feet southwest of Area #1 , <br /> along the reported telephone easement. A hand auger boring will <br /> be excavated to a maximum depth of five feet below ground <br /> surface. Two soil samples will be collected from the boring and a <br /> water sample will be collected if water is encountered. <br /> Areas #5 and #6 <br /> Areas #5 and #6 will be located in response to encountered field <br /> conditions and will step-out from suspect contamination. Hand <br /> auger borings will be excavated to a maximum depth of five feet <br /> below ground surface. Two soil samples will be collected from <br /> each boring and water samples will be collected if water is <br /> encountered. <br /> 2) Prepare Field Samples for Analysis <br /> The field samples will be collected in accordance with the attached Dry Ground <br /> Standard Operating Procedures. <br /> 3) Provide For Laboratory Analysis of the Samples. <br /> The following laboratory tests will be conducted: <br />
The URL can be used to link to this page
Your browser does not support the video tag.