Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> FACILITY BACKGROUND <br /> Site was used as an illegal drug manufacurin f, acility. Sample of liquid collected from septic tank <br /> contained benzene at 195 ppb. Primga potential chemical hazards are VOCs, primarily benzene. <br /> Physical hazards include noise and physical proximity to drilling equipment. A slight fire and <br /> explosion hazard exists due to presence of benzene. <br /> I] Underground/Overhead Utilities (show location of utilities on site map) <br /> ✓ How were underground utilities identified? Underground Service Alert will be called on: <br /> 9/5/00 <br /> EXPOSURE MONITORING <br /> Soil cuttings and breathing zone should be monitored for volatile organics using a photo ionization <br /> detector (PID) at frequent intervals. Intervals and readings should be recorded in field notes. All <br /> sampling instruments will be calibrated per the manufacturer instructions on a daily basis. <br /> PAGE 3 <br />