My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MARSHALL
>
1752
>
2900 - Site Mitigation Program
>
PR0516494
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2020 4:33:55 PM
Creation date
3/26/2020 4:31:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0516494
PE
2950
FACILITY_ID
FA0012642
FACILITY_NAME
FANNIE MAE
STREET_NUMBER
1752
STREET_NAME
MARSHALL
STREET_TYPE
AVE
City
STOCKTON
Zip
95205
APN
12721206
CURRENT_STATUS
01
SITE_LOCATION
1752 MARSHALL AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> As a minimum, Level D protection is required on all GZA worksites. Level D includes: <br /> ✓ Steel toed boots <br /> ✓ Safety Glasses <br /> ✓ Hard Hat <br /> For each task on this project, identify additional protective garments as required and include the <br /> conditions under which the level of PPE would be modified for each task. <br /> t:..:. : >;:: <br /> . .: t� d>iioi `>,`.,.. Personnel:. Qermer�t{ 1 <br /> All Working Near Vehicle Orange Vests <br /> All >20 ppm for 5 minutes 1/2 Face Respirator <br /> All >200 ppm for 5 minutes Evacuate Site Full Face Respirator <br /> SITE CONTROL AND COMMUNICATIONS <br /> The buddy system must be used on all GZA hazardous waste sites. <br /> Site will be secured as follows: Fencing will be used when possible. <br /> Work Zones will be marked as follows: Barricades and caution tape will be used to mark off <br /> work zone. <br /> On-site communications: ❑ Radio 0 Verbal ❑ Hand Signals <br /> ❑ Other <br /> Designate hand signals here: <br /> Off-site communications: ❑ Radio 0 Telephone <br /> ❑ Other <br /> PAGE 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.