Laserfiche WebLink
Ground Zero Analysis, Inc. <br /> SITE SAFETY PLAN <br /> The specific signal for an emergency is: Verbally Given <br /> The specific signal for an evacuation is: Verbally Given <br /> Evacuation assembly point is: To be determined on-site prior to beginning work activities. <br /> SANITATION AND DECONTAMINATION <br /> Personnel Decontamination Procedure: <br /> All contaminated personal protective equipment (i.e., gloves, coveralls) will be placed in sealed 5- <br /> gallon containers pending laboratory analysis. <br /> Location of Wash Water: Portable, <br /> Location of Toilet: None <br /> Location of Drinking Water: Portable <br /> Equipment Decontamination Procedure: Equipment will be washed with a trisodium <br /> phosphate solution and/or steamcleaned. <br /> Materials to be disposed of: All soil and water produced will be stored on- <br /> site in sealed 5-gallon containers until <br /> appropriate disposal methods are determined. <br /> PAGE 5 <br />