Laserfiche WebLink
Table 1 <br /> Summary of Proposed Offsite Well Completions <br /> Stockton Terminal Technical Committee(STTC) <br /> Port of Stockton, California <br /> Wcll or Notes Total Boring Well Screen Sand Bentonite Sample <br /> Baring Depth Diam Diam Interval Length Blank Interval Height Interval Height every 5 ft <br /> Number (feet) (7 nchj (Inch) (feet) (feet) (feet) (feet) (fee[) (feet) (feet) #Sleeves <br /> Groundwater Moniturnig Wells <br /> A Zone Wells <br /> OW-IA I Hollow Stem augers(PVC) 19 8 2 4 to 19 15 4 3.5 to 19 15.5 3.5 to 2.5 1 4 <br /> OW-2A I Hollow Stem augers(PVC) 19 8 2 4 to 19 15 4 3.5 to 19 15.5 3.5 to 2.5 1 4 <br /> OW-4A I Hollow Stem augers(PVC) 19 8 2 4 to 19 15 4 3.5 to 19 15.5 3.5 to 2.5 1 4 <br /> OW-7A I Hollow Stem augers(PVC) 19 8 2 4 to 19 15 4 3.5 to 19 15.5 3.5 to 2.5 1 4 <br /> OW-8A I Hollow Stem augers(PVC) 19 8 2 4 to 19 15 4 3.5 to 19 15.5 3.5 to 2.5 1 4 <br /> B Zone Wells <br /> Casing-Ham ner{P 3--3 <br /> OW-4B 1 Casing Hammer(PVC) 42 8 2 32 to 42 10 32 30 to 42 12 30 to 27 3 <br /> OW-7B 1 Casing Hammer(PVC) 47 8 2 37 to 47 10 37 35 to 47 12 35 to 32 3 <br /> 0W-8B 1 Casing Hammer(PVC) 45 8 2 35 to 45 10 35 33 to 45 12 33 to 30 3 <br /> C Zone Wells <br /> OW-3C l Casing Hammer(PVC) 62 8 2 52 to 62 10 52 50 to 62 12 50 to 47 3 <br /> OW-4C 1 Casing Hammer(PVC) 63 8 2 63 to 73 10 53 61 to 73 12 61 to 58 3 <br /> OW-7C l Casing Hammer(PVC) 67 8 2 57 to 67 10 57 55 to 67 12 55 to 52 3 <br /> OW-8C 1 Casing Hammer(PVC) 75 8 2 65 to 75 10 65 63 to 75 12 63 to 60 3 <br /> D Zone Wells <br /> OW-31) l Casing Hammer(PVC) 82 8 2 72 to 82 10 72 70 to 82 12 70 to 67 3 <br /> OW-513 l Casing Hammer(PVC) 87 8 2 77 to 87 10 77 75 to 87 12 75 to 72 3 <br /> OW-6D l Casing Hammer(PVC) 80 8 2 70 to 80 10 70 68 to 80 12 68 to 65 3 <br /> OW-713 1 Casing Hammer(PVC) 90 8 2 80 to 90 10 80 78 to 90 12 78 to 75 3 <br /> otals 863195 668 41 '.19 <br /> File:STTC\Table\STTC-Total Drill Plan 05-13-02 Page 1 of 2 <br />