Laserfiche WebLink
Ozone Sparge Test Wells(Stork Road) <br /> OZT-1 I Ozone monitoring well 17 8 2 7 to 17 10 7 6 to 17 11 6 to 4.5 1.5 3 <br /> Twined vapor monitor point 1.0 2.5 to 3.5 1 1.5 2 to 4.5 2.5 2 to 0.5 1.5 <br /> OZT-2 I Ozone monitoring well 17 8 2 7 to 17 10 7 6 to 17 11 6 to 4.5 1.5 3 <br /> Twined vapor monitor point 1.0 2.5 to 3.5 1 1.5 2 to 4.5 2.5 2 to 0.5 1.5 <br /> OZT-3 1 Ozone monitoring well 17 8 2 7 to 17 10 7 6 to 17 11 6 to 4.5 1.5 3 <br /> Twined vapor monitor point 1.0 2.5 to 3.5 1 1.5 2 to 4.5 2.5 2 to 0.5 1.5 <br /> OZT-4 1 Ozone monitoring well 17 8 2 7 to 17 10 7 6 to 17 11 6 to 4.5 1.5 3 <br /> Twined vapor monitor point 1.0 2.5 to 3.5 1 1.5 2 to 4.5 2.5 2 to 0.5 1.5 <br /> OZT-5 1 Ozone monitoring well 17 8 2 7 to 17 10 7 6 to 17 11 6 to 4.5 1.5 3 <br /> - -wined vapor monitor point 4.0 2.-5-4 1-.-5-- <br /> IW--1 1 Ozone Sparge well 20.5 8 1.0 17 to 20 3 17.5 16 to 20 4 16 to 4.5 11.5 <br /> Twined vapor monitor point 1.0 2.5 to 3.5 1 1.5 2 to 4.5 2.5 2 to 0.5 1.5 <br /> IW-2 I Ozone Sparge well 20.5 8 1.0 17 to 20 3 17.5 16 to 20 4 16 to 4.5 11.5 <br /> Twined vapor monitor point 1.0 2.5 to 3.5 1 1.5 2 to 4.5 2.5 2 to 0.5 1.5 <br /> Totals 7 126 63 80.5 1 80.5 1 1 41 IF 17 <br /> Exolaination <br /> bgs=below ground surface • <br /> Diann=Diameter of boring or well casing <br /> OW-8C=Groundwater Monitoring Wells Proposed by IT <br /> PS-MW-18C=Groundwater Monitoring Wells Proposed by SECOR <br /> Ozone Sparge Wells Recommended by IT in Feasibility Work Plan <br /> Ozone Injection wells will be continuously cored using 5 foot core barrel <br /> Ozone monitoring wells will be sampled at 5 foot intervals <br /> Ozone Injection wells will be completed with 1"diameter Schedule 80 PVC casing and screen. <br /> File:STTC\Table\STTC-Total Drill Plan 05-13-02 Page 2 of 2 <br />