Laserfiche WebLink
SECOR <br /> 11.0 SECOND QUARTER 2006 PLANNED ACTIVITIES <br /> A summary of activities planned for the first quarter 2006 at the STTC and BP, Time Oil, and <br /> Tesoro Terminals is provided below. <br /> 11.1 Planned Activities at STTC <br /> • Perform quarterly groundwater monitoring and sampling. <br /> • Survey reinstalled well TS/MW-2D and wells AR/MW-21A, AR/MW-18B, AR/MW-18C, <br /> which had their TOC's altered due to redevelopment activities taking place west of the <br /> POSDEF COGEN plant (Figure 1A). The surveying activities were performed on April <br /> 25, 2006. <br /> • Oversee continued operation and maintenance of both the East and West Ozone <br /> Systems. Maintenance activities will include rebuilding the East System compressor. <br /> 11.2 Additional Activities Planned at BP, Tesoro, and Time Oil Facilities <br /> BP Terminal: <br /> • • SECOR has no plans for conducting additional site work at the BP Terminal at this time. <br /> Tesoro Terminal: <br /> • SECOR has no plans for conducting additional site work at the Tesoro Terminal at this <br /> time. <br /> Time Oil Terminal: <br /> • SECOR has no plans for conducting additional site work at the Time Oil Terminal at this <br /> time. <br /> • <br /> STTC 1Q06 Final Report 22 May 1, 2006 <br /> 770T.43673.12.0002 <br />