My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
0
>
2900 - Site Mitigation Program
>
PR0009171
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2020 11:48:42 AM
Creation date
3/30/2020 11:16:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0009171
PE
2960
FACILITY_ID
FA0004011
FACILITY_NAME
PORT OF STOCKTON-FUEL TERMINAL
STREET_NUMBER
0
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
CURRENT_STATUS
01
SITE_LOCATION
NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR <br /> 11.0 SECOND QUARTER 2006 PLANNED ACTIVITIES <br /> A summary of activities planned for the first quarter 2006 at the STTC and BP, Time Oil, and <br /> Tesoro Terminals is provided below. <br /> 11.1 Planned Activities at STTC <br /> • Perform quarterly groundwater monitoring and sampling. <br /> • Survey reinstalled well TS/MW-2D and wells AR/MW-21A, AR/MW-18B, AR/MW-18C, <br /> which had their TOC's altered due to redevelopment activities taking place west of the <br /> POSDEF COGEN plant (Figure 1A). The surveying activities were performed on April <br /> 25, 2006. <br /> • Oversee continued operation and maintenance of both the East and West Ozone <br /> Systems. Maintenance activities will include rebuilding the East System compressor. <br /> 11.2 Additional Activities Planned at BP, Tesoro, and Time Oil Facilities <br /> BP Terminal: <br /> • • SECOR has no plans for conducting additional site work at the BP Terminal at this time. <br /> Tesoro Terminal: <br /> • SECOR has no plans for conducting additional site work at the Tesoro Terminal at this <br /> time. <br /> Time Oil Terminal: <br /> • SECOR has no plans for conducting additional site work at the Time Oil Terminal at this <br /> time. <br /> • <br /> STTC 1Q06 Final Report 22 May 1, 2006 <br /> 770T.43673.12.0002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.