Laserfiche WebLink
Mr. Jeff Baker <br /> Stockton Terminals Technica*mmittee 3 • 10 June 2011 <br /> Groundwater monitoring data from TS/MW-2D, TS/MW-3D, TS/MW-3DR and <br /> TS/MW-4D are being assessed to evaluate the pilot study. By 1 March 2012 <br /> Tesoro needs to submit a pilot test report summarizing the results, <br /> recommendations, and conclusions of the pilot test. <br /> In summary, please submit the following by the dates shown: <br /> • 30 June 2011 — billing contact information for Buckeye <br /> • 30 June 2011 — Hydrogen Peroxide Pilot Study results <br /> • 11 July 2011 — comments on the attached draft MRP <br /> • 1 August 2011 — complete the well abandonments, install the replacement wells, <br /> and submit a report of findings <br /> • 1 March 2012 — Oxygen Injection Pilot Test Report <br /> If you have any questions regarding this letter, you may contact me at (916) 464-4819 or <br /> by email at kshelton@waterboards.ca.gov. <br /> C;�& <br /> KRISTI SHELTON, P.E. <br /> Water Resources Control Engineer <br /> Attachment <br /> cc: Mr. Harlin Knoll, San Joaquin County Environmental Health Department, Stockton <br /> Mr. Jeffrey Wingfield, Port of Stockton, Stockton <br /> Mr. Joe Aldridge, NuStar, Texas <br /> Ms. Katherine Schenderlein, Buckeye Partners, Breinigsville, PA <br /> Mr. Mark Chandler, Time Oil Company, Seattle, WA <br /> Mr. Steve Osborn, Kinder Morgan Energy Partners, Rocklin <br /> Ms. Danielle Caitlin-Wright, Arcadis, Roseville <br /> Mr. Chris Sheridan, Ash Creek Associates, Inc., Portland, OR <br /> Mr. Gary Haeck, Stantec Consulting Corporation. Rancho Cordova <br />