Laserfiche WebLink
-:XPLANATION <br /> ._ocation of Proposed Phase I <br /> •A1µ,-11 iydropunch Sample <br /> _ocation of Proposed Phase II Hydropunch Sample* <br /> Groundwater Monitoring Well <br /> MW-9 Mw-10• SoMw--xisting <br /> ..ocation of Proposed Shallow Groundwater <br /> 51anitoring Well* <br /> TANK 21 TANK U <br /> TANK 16 ocation of Proposed Shallow Groundwater <br /> -xtraction Well <br /> •Mw-a <br /> TANK 19 TANK 17 <br /> TANY <br /> MW-7 Mµ,-6 <br /> • 1: Phase II hydropunch sample and monitoring well <br /> locations are approximate and are subject to <br /> TANK 19 <br /> (TANK change based on Phase I hydropunch results. <br /> Mw-50 <br /> • Approximately 12 to 15 total hydropunch samples <br /> Mw-4 will be collected. <br /> •MW-19 EARTHEN BERM <br /> 0 80 160 <br /> I i <br /> i <br /> SCALE IN FEET <br /> Locations of Proposed Groundwater PLATE <br /> Monitoring W0113 and Hydropunch Samples J <br /> Shell Oil Distribution Facility <br /> Stockton, Califorina <br /> m^ APPROVED <br /> nP DATE REVISED DATE <br /> 7/92 <br />