Laserfiche WebLink
Ms. Devra Lewis <br /> February 20, 2003 <br /> Page 6 of 6 <br /> References <br /> CVRWQCB, 2003. Letter to Jeff Goold, Equiva Services LLC, RE: Review of Delineation <br /> Work Plan, Equilon Enterprises, LLC, Bulk Fuel Terminal, Stockton, San Joaquin <br /> County. January 30. <br /> RETEC, 2003. Work Plan for Additional Delineation; Shell Bulk Fuel Facility—Stockton Plant; <br /> 3515 Navy Drive, Stockton, California January 24. <br /> If you have any questions regarding this work plan, please contact either Bryan Stone or Dawn <br /> Garcia at (562)420-2933. <br /> Sincerely, <br /> The RETEC Group, Inc. <br /> Bryan Stone Dawn H. Garcia, R.G. <br /> Project Manager Project Geologist <br /> Attachments: <br /> Figure 1- Proposed Geoprobe Groundwater Investigation Locations <br /> Appendix A—Field Procedures <br /> SOP 120—Decontamination <br /> SOP 212—Procedures for Direct Push Technology Probe System <br /> SOP 220—Monitoring Well Construction and Installation <br /> SOP 221 —Groundwater Well Development <br /> SOP 230—Groundwater Sampling <br /> cc: Jeff Goold—Shell OPUS, 10602 NE 38d' Place, Kirkland, WA 98083 <br /> Ron Orallo—Shell OPUS, 2165 O'Toole Ave, San Jose, CA 95131 <br /> Bob Leach—Shell OPUS, 3515 Navy Drive, Stockton, CA 95201 <br /> Carlton Jordan—Shell Pipeline Company LP, Box 6249, Carson, CA 90749 <br /> C. Houck—RETEC, Seattle <br /> D. Garcia—RETEC, Long Beach <br /> File: SHEL5-16352-500 <br />