Laserfiche WebLink
• i <br /> Hol a�r2nfo�(�MTech PBo WELL NUMBER SS-MW1 Page 1 of 1 <br /> uu LSInIWVV��W uulV� PROJECT Stockton Phase II <br /> ny PROJECT NUMBER 501135042 <br /> SITE LOCATION Drum Storage Area <br /> EASTING= NORTHING= LOCATION FR Manufacturing, Stockton, CA <br /> GSE 27.1 TOC 26.69 DATUM MSL LOGGED BY C.M. Cochrane <br /> t7 <br /> 0 <br /> DEPTHBLOW SAMPLE <br /> (ft) COUNT TYPE a DESCRIPTION WELL <br /> COMPLETION <br /> a <br /> co <br /> 0- <br /> 0 to 40' [MLI: SANDY SILT; brown (10YR 5/3), 70-90% silt, 10-30% very fine <br /> _ sand, very stiff to hard, dry. <br /> 5 — <br /> 10-: 15 — <br /> 18 <br /> 16= 25 —. <br /> 20 20 — <br /> 18 <br /> 25 15 <br /> so— <br /> 4 — <br /> 8 <br /> 35 12 —. <br /> 40 11 40 to 55' [SMI: SILTY SAND; pale brown (10YR 6/3), 60-90% very fine to fine <br /> 15 _ sand, 10-40% silt, medium dense, damp. <br /> 45 22 —. <br /> 50 9 — <br /> 13 <br /> 55 18 <br /> 55 to 70' IMLI: SANDY SILT; light brownish gray(10YR 6/2), 70-90% silt, <br /> 10-30% very fine sand, stiff, moist. <br /> 60= — <br /> 62.0 <br /> _ 63.0 <br /> 65-:: 65.0 <br /> 70-:: 4 / 70 to 75' ICL]: SILTY CLAY;dark greenish gray(1 OYR 4/1), 70-80% clay, _ <br /> 8 / j 20-30% silt, stiff, wet. <br /> 75-- 10 = <br /> 75 to 85' ISM]: SILTY SAND; light gray (1 OYR 7/2), 70-80% fine to coarse sand — <br /> 20-30% silt, loose, wet. -_ <br /> 80 3 — — <br /> 5 = <br /> 85 5 — = 85.0 <br /> DRILLING CONTRACTOR Gregg Drilling TOTAL DEPTH BORING it: 85.0 TOTAL DEPTH WELL ft: 85.0 <br /> HOLE DIAMETER 8" REMARKS: <br /> DRILLING METHOD Auger <br /> DRILLING EQUIPMENT M-11 <br /> DRILLING STARTED 8/21/95 ENDED 8/21/95 <br />