Laserfiche WebLink
Hyl W ll DWO���QW�Wy �M(ao WELL NUMBER SS-MW2 Page 1 of 1 <br /> 011 OA llTetra Tech <br /> 1111Company <br /> Ul�l PROJECT Stockton Phase II <br /> PROJECT NUMBER 501135042 <br /> SITE LOCATION Sand Blasting Area <br /> EASTING= NORTHING= LOCATION FR Manufacturing, Stockton, CA <br /> GSE 27.1 TOC 26.68 DATUM MSL LOGGED BY C.M. Cochrane <br /> 0 <br /> DEPTH BLOW SAMPLE J <br /> DESCRIPTION WELL <br /> Iftl COUNT TYPE i COMPLETION <br /> a <br /> s <br /> t7 <br /> 0- <br /> 0 to 70' [MLI: SANDY SILT; pale brown (1 OYR 6/3), 70-90% silt, 10-30% very <br /> fine sand, very stiff to hard,dry. <br /> 5 — <br /> 10- <br /> 12 — <br /> 18 <br /> 15 24 —. <br /> 20-7- <br /> -8 — <br /> 9 <br /> 25= 22xx <br /> —. <br /> 30 — <br /> 35 — <br /> 40-7- <br /> 6 — <br /> 12 <br /> 45 18 —. <br /> 50 7 — <br /> 14 <br /> 55 18 — <br /> 60 60.0 <br /> 7 � � X63.0 <br /> 10 _ <br /> 65 15 — 65.0 <br /> 70-7- <br /> 6 / 70 to 75 ICLI: SILTY CLAY; dark greenish gray 0OYR 4/1), 70-80% clay, _ <br /> 8 / 20-30% silt, stiff,wet. <br /> 76-- 12 <br /> 75 to 80' ISM]: SILTY SAND; dark greenish gray (10YR 4/1), 80-90% fine sand <br /> _ 10-20% silt, loose,wet. <br /> 80-:: 80 to 85' [SWI: SAND; greenish gray(1 OGY 5/1),fine to coarse sand, loose, <br /> wet. _ <br /> 85 = 85.0 <br /> DRILLING CONTRACTOR Gregg Drilling TOTAL DEPTH BORING ft: 85.0 TOTAL DEPTH WELL ft: 85.0 <br /> HOLE DIAMETER 8" REMARKS: <br /> DRILLING METHOD Auger <br /> DRILLING EQUIPMENT M-11 <br /> DRILLING STARTED 8122195 ENDED 8122/95 <br />