My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
0
>
2900 - Site Mitigation Program
>
PR0506239
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
3/30/2020 4:55:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506239
PE
2950
FACILITY_ID
FA0007296
FACILITY_NAME
CITY OF ESCALON
STREET_NUMBER
0
STREET_NAME
STATE ROUTE 120
City
ESCALON
Zip
95320
CURRENT_STATUS
02
SITE_LOCATION
HWY 120
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/23/86 MON 10:38 FAX 209 948 0621 KLEINFELDER Z004 <br /> KLEINFELDER <br /> File No. 7-0-3941-1)LEO <br /> October 24, 1996 <br /> • if services such as additional chemical analysis (other than those detailed in the attached cost <br /> estimate) are required, said additional services would be provided at the same unit rates as <br /> detailed on the attached cost estimate following written authorization by the client. <br /> LIMITATIONS <br /> Kleinfelder offers various levels of investigative and engineering services to suit the varying <br /> needs of different clients. Although risk can never be eliminated, more-detailed and extensive <br /> investigations yield more information, which may help understand and manage the level of risk. <br /> Since detailed investigation and analysis involves greater expense, our clients participate in <br /> determining levels of service which provide adequate information for their purposes at acceptable <br /> levels of risk. Acceptance of this proposal will indicate that City of Escalon has reviewed the <br /> scope of work and determined that it does not need or want a greater level of service than will be <br /> provided. Any exceptions should be noted and may result in higher fees. <br /> Regulations and professional standards applicable to Kleinfelders services are continually <br /> evolving. Techniques are, by necessity, often new and relatively untried. Different professionals <br /> may reasonable adopt different approaches to similar problems. Therefore, no warranty or <br /> :guarantee,expressed or implied,will be included in Kleinfelder's cope of service. <br /> During the course of the performance of Kleinfelder's services, hazardous materials may be <br /> discovered. Kleinfelder will assume no responsibility or liability whatsoever for any claim, loss <br /> of property value, damage, or injury that results from pre-existing hazardous materials being <br /> encountered or present on the project site or from the discovery of such hazardous materials. <br /> Nothing contained in this proposal should be construed or interpreted as requiring Kleinfelder to <br /> assume the status of an owner, operator, generator, or person who arranges for disposal,transport, <br /> storage or treatment of hazardous materials within the meaning of any governmental stature, <br /> regulation, or order. City of Escalon will be solely responsible for notifying all governmental <br /> agencies and the public at large of the existence, release, treatment of disposal of any hazardous <br /> materials observed at the project site, either before or during performance of Kleinfeldces <br /> services. City of Escalon will be responsible for all arrangements to lawfully store, treat,recycle, <br /> dispose, or otherwise handle hazardous materials, including cuttings and samples resulting from <br /> Kleinfelder's services. <br /> This proposal may be used only by the client and only for the purposes stated, within a reasonable <br /> time from its issuance. Land use, site conditions (both on-site and off-site) or other factors may <br /> change over time,tumd additional work may be required with the passage of time. <br /> �0-3941-l�l.F,(1!/Ml.9fflAfi! <br /> Page.3 pf4 0!496.Kldrif€!der,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.