Laserfiche WebLink
Fite No 20-3941-01 E01 k'q KLEINFELDER <br /> April 2, 1997 <br /> Since the time of the above-referenced report, the proposed alignment has changed, necessitating <br /> a boring be placed south of the ARCO tank cluster That proposed scope of work was detailed in <br /> a K1emfelder proposal dated March 6, 1997 for the ARCO site The results of the proposed <br /> investigation are detailed in this report as follows <br /> 1 <br /> 1 <br /> 1 <br /> t <br /> 20-3941-01 E0112017R005 Page 5 of 11 01997 Klernfelder Inc <br />