Laserfiche WebLink
iw <br /> � h11.0 95 31O 11:11 FAX 15109.Q996,5 ERMWEST WC ~` VA 007 <br /> Activit X Location Action Level Level of Protection <br /> Soil sampling SB-1, S13-2, SB- 0-5 ppin Level D <br /> 3 (0-0.5 mg/m3) <br /> (SEE ABOVE) (SEE ABOVE) 6-25 ppm Level C, half-face APR <br /> (os-2.0 mg/M3) <br /> (SEE ABOVE) (SEE ABOVE) 26-50 ppm Level C, full-face APR <br /> (2.0-5.0 mg/m3) <br /> (SEE ABOVE) (SEE ABOVE) >50 ppm Discontinue work and <br /> (>5.0 mg/m5) evacuate exclusion <br /> zone <br /> 11. Contingency Procedures: <br /> In the event of an emergency, site personnel will signal distress with <br /> three blasts of a horn (vehicle horn will be sufficient), It is the Site Safety <br /> Officer's duty to evaluate the seriousness of the situation and to notify <br /> appropriate authorities. Section 12 of this plan contains emergency <br /> telephone numbers as well as directions to the hospital. Communication <br /> signals need to be established where communication equipment is not <br /> feasible. Nearby telephone access must be identified. and available to <br /> communicate with local authorities. Dial "911" in the event of an <br /> emergency. A daily morning briefing to cover safety procedures and <br /> contingency plans in the event of an emergency are to be included along <br /> with a discussion of the daily activities. These daily meetings will be <br /> recorded on ERM Daily Tailgate Safety Meeting Forms. A debriefing to <br /> cover the activities is to be held upon completion of the work. <br />